ABSTRACT:
A plurality of preprogrammed switches is disposed in a looped distribution line downstream from a source of power to respond to a short circuit and to reconfigure the line to isolate the short circuit. Some of the preprogrammed switches are each provided with a unique open time interval, such as t1, t2 and t3. Others of the plurality of preprogrammed switches can then determine which switch is opening in response to the short circuit and can identify the portion of the line that is shorted. Certain of the preprogrammed switches can then reconfigure to protect the identified portion of the line.
REFERENCES:
patent: 4994934 (1991-02-01), Bouhenguel
patent: 5097380 (1992-03-01), Moran
patent: 5237511 (1993-08-01), Caird et al.
patent: 5303112 (1994-04-01), Zulaski et al.
patent: 5373411 (1994-12-01), Grass et al.
patent: 5513061 (1996-04-01), Gelbien et al.
patent: 5629825 (1997-05-01), Wallis et al.
patent: 5896302 (1999-04-01), Goodpaster
patent: 5973899 (1999-10-01), Williams et al.
patent: 6005759 (1999-12-01), Hart et al.
patent: 6008971 (1999-12-01), Duba et al.
patent: 6212049 (2001-04-01), Spencer et al.
patent: 6239960 (2001-05-01), Martin
patent: 6341054 (2002-01-01), Walder et al.
patent: 6459998 (2002-10-01), Hoffman
patent: 6549880 (2003-04-01), Willoughby et al.
patent: 6577963 (2003-06-01), Cordray et al.
patent: 6667866 (2003-12-01), LaPlace et al.
patent: 6704181 (2004-03-01), Saksa
patent: 6707655 (2004-03-01), McElray, Sr. et al.
patent: 6816757 (2004-11-01), De La Ree et al.
patent: 2002/0101695 (2002-08-01), Saksa
patent: 2002/0131222 (2002-09-01), McClure et al.
Cooper Power Systems, Type LS Loop Sectionalizing Control Installation and Operation Instructions, Apr. 2001, 20 pgs., Waukesha, Wisconsin.
Cooper Power Systems, Form 6-LS Pole Mount Recloser Control Installation and Operation Instructions, Dec. 2004, 48 pgs., Pewaukee, Wisconsin.
Keckalo David
Lee Tony J.
Cummings, P.C. Eugene M.
Nguyen Danny
Schweitzer Engineering Laboratories Inc.
Sherry Michael J
LandOfFree
Methods and systems for sectionalizing a looped distribution... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Methods and systems for sectionalizing a looped distribution..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Methods and systems for sectionalizing a looped distribution... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4013314