ABSTRACT:

FIELD OF THE INVENTION
This invention relates to oil/gas field drilling, and more particularly to an improved method of identifying the anodic and cathodic areas along a well casing.
BACKGROUND OF THE INVENTION
The underground casings of oil and gas wells are subject to long-line and localized corrosion due to electrical potential differences developed when the well casing extends through different underground formations or strata with varying electrical conductivities. The different formations generally each contain different salt and water concentrations, and therefore different potential differences are developed between any two sections of casing in contact with two different formations. Electrons leave one of these sections, rendering this section anodic, flow through the casing and collect on the other of the sections, rendering this second section cathodic. Positive hydrogen ions complete the circuit by gathering on the cathodic area through the formation.
As the electrons flow through the casing, an electrochemical process causes hydrogen atoms to form in the cathodic area and iron from the casing to dissolve in the anodic area. The iron is dissolved by the formation of iron ions. The hydrogen formed in the cathodic area is removed by reaction with oxygen to form water or by the action of hydrogen consuming bacteria.
If the electron flow is permitted to continue, enough iron will be removed from the casing to corrode the casing and eventually cause leaks to develop.
Conventionally, this electrochemical corrosion in the anode area is prevented by connecting the negative terminal of a direct current source to the casing and connecting the positive terminal of the source to an anode buried in the earth adjacent to the well. If the direct current is appropriately applied, all points along the length of the casing will be cathodic with respect to the buried anode, the electrons will flow from the anode to the casing through the metallic path, and no corrosion of the casing occurs.
In order to apply the direct current appropriately, however, it is important to know which areas of the well casing are cathodic and which are anodic, and by how much. It is the usual practice to apply the cathodic protection current to the deepest anodic region, but if one section of the casing is particularly anodic due to the particular nature of the underground formation of its environment, the application of direct current can be made more accurately. In the absence of this type of information, current may be applied in insufficient strength or where it is not needed.
In the prior art, the identification of cathodic and anodic areas has been made on the well casing after the well has been drilled and the casing is in place using a specialized Cathodic Protection Evaluation Tool (CPET) that is moveable along the casing to measure the potential and generate a CPET log. Unfortunately, these logs are expensive, costing approximately $10,000 per log.
The conventional practice has therefore been to do only one CPET log at each new field, in either a static or polarized run, and to try to generalize the data gathered from that log to all wells in the same field. A static CPET log run is conducted to determine if corrosion is taking place so that cathodic protection is needed and if so, how much. A polarized CPET log run is conducted by first applying cathodic protection for a few weeks to fully polarize the casing and then running the polarized CPET log to determine whether the applied cathodic protection has actually provided adequate protection to the casing down through the corrosive zone, in an attempt to optimize the CP system current output.
However, the conventional method of trying to generalize the CPET log data from one well to the entire field has not proven to be sufficiently accurate in determining the correct amount and depth of application of cathodic protection current. While this method provides useful information, it is clearly not an optimized solution.
OBJECTS AND SUMMARY OF THE INVENTION
It is therefore an object of the present invention to provide a method of identifying the anodic and cathodic areas along a well casing that avoids the above-described difficulties of the prior art.
It is a further object of the present invention to provide a method of identifying the anodic and cathodic areas along the well casings of a number of wells that does not require a separate CPET log for each well.
It is another object of the present invention to provide a method of identifying anodic and cathodic areas along a well casing that avoids the expense and difficulty of the prior art.
It is yet another object of the present invention to provide a method of identifying the anodic and cathodic areas along a well casing that is performed at the time of the drilling of the well itself.
The above and other objects are achieved by the present invention which recognizes that information as to which areas of a well casing will be cathodic or anodic is in fact available from another source separate from the CPET logs, i.e. from the drill stem resistances measurable as the well itself is being drilled. The drill stem resistances can be correlated to the types of soil in the different underground formations through which the drilling is passing, for example by using a single CPET log for one of the plurality of wells to be drilled in the same field, and this in turn identifies which well casing sections, when inserted into the different types of soil, will be relatively cathodic or anodic and to what extent. Thereafter, when the next well is drilled in this field and its drill stem resistances are measured, it is possible to identify the different underground formations through which the second casing will pass, and from this information to predict which portions of the second casing will be anodic or cathodic.
Thus, in accordance with the present invention, the first well in a new field may be drilled and the casing put in place, with the drill stem data being collected during drilling. Then a one-time CPET log run is conducted for this well, and the CPET findings are compared to and matched with the findings from the drill stem data to confirm the identification of the cathodic and anodic zones for casings in the underground formations. Subsequently, as additional wells are drilled in this field, the cathodic and anodic regions of their well casings can be determined from their drill stem data alone, without a separate CPET for each additional well. The collection of the drill stem data is much easier and less expensive than running a CPET, and therefore the method in accordance with the present invention provides substantial advantages over the prior art.
Accordingly, in one preferred embodiment, the present invention is directed to a method of well casing cathodic current optimization for application of cathodic current to an underground well casing in a field intended to have at least a first well. The method comprises the steps of measuring drill stem resistances along a well hole for the first well, correlating the drill stem resistances to respective types of underground formations having respective resistivity conditions at corresponding positions along the well hole, predicting, in accordance with the correlating step, a position of at least one anodic area on a well casing to be installed in the well hole due to the resistivity conditions of the types of underground formations that will be in electrical contact with the well casing when installed, and determining, in accordance with the predicting step, at least one application position on the well casing and an amount of cathodic current to be applied to each application position to avoid corrosion of the well casing when installed.
In accordance with another preferred embodiment, the present invention is directed to a method of well casing cathodic current optimization for application of cathodic current to an underground well casing in a field intended to have at least first and second wells. The method comprises the steps of measuring

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of well casing cathodic protection optimization using... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of well casing cathodic protection optimization using..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of well casing cathodic protection optimization using... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3241262

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.