Method of producing a subterranean structure

Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Boring

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

405132, 405149, E21D 900, E21D 1100

Patent

active

046487433

ABSTRACT:
In a method of producing a subterranean structure comprises the steps of excavating a ditch or hole in the ground to a desired subterranean level, placing the ceiling directly on the excavated ground at this level, filling the hole in the ground, and driving an arched tunnel into the ground below the ceiling, the ceiling is fixed in position and the ground is stabilized before the hole is filled and the arched tunnel is driven into the ground, by anchoring the ceiling with retaining elements projecting downwardly from the ceiling into the ground below, and arranging the retaining elements to form piles protecting the tunnel arch at respective sides thereof and preventing earth from crashing through the tunnel arch.

REFERENCES:
patent: 440576 (1890-11-01), Radcliffe
patent: 745457 (1903-12-01), McBean
patent: 902973 (1908-11-01), Knudsen
patent: 2839271 (1958-06-01), Kandle

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of producing a subterranean structure does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of producing a subterranean structure, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of producing a subterranean structure will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1019054

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.