Method of producing a concrete lined tunnel or other underground

Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Lining

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21D 1115

Patent

active

041299914

ABSTRACT:
A method of producing a concrete lined tunnel, or other concrete lined underground excavation, in which first a rough tunnel is excavated of a cross-section which is greater than that of the tunnel to be lined with concrete, whereafter a lost form is connected by support members to the inner surface of the rough tunnel spaced at a distance therefrom which corresponds to the expected maximum settlement of the inner surface under the influence of the rock pressure acting thereon, and finally applying a concrete lining to the inner surface of the lost form, while the rigidity of the support members relative to the rock pressure is made smaller than that of the concrete lining so that the support members may yield during the settlement of the rough tunnel.

REFERENCES:
patent: 1853224 (1932-04-01), Proctor

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of producing a concrete lined tunnel or other underground does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of producing a concrete lined tunnel or other underground, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of producing a concrete lined tunnel or other underground will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2368842

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.