ABSTRACT:
BACKGROUND OF THE INVENTION
1. Field of the Invention
This invention pertains generally to a method of optimizing the scheduling of inspections of heat exchanger tubes and minimizing the number of tubes to be sampled as part of that inspection, and more particularly, to the optimization of the inspection of second generation nuclear powered steam generators in a risk informed manner.
2. Related Art
Steam generators in nuclear power reactor systems have a primary side through which the reactor coolant is circulated and a secondary side in heat exchange relationship with the primary side. The reactor coolant enters an inlet plenum and is circulated through tubes to an outlet plenum where it is returned to the reactor. The secondary side includes a water reservoir that surrounds the tubes that is fed by a feedwater inlet. The heat from the primary side converts the water on the secondary side to steam, which is used to drive a turbine that in turn powers a generator to create electricity. The tubes through which the primary coolant passes shield much of the radioactivity carried by the coolant, from the secondary side. The number of such tubes in a typical power plant steam generator can number in the order of thousands. Tube integrity is a safety concern and is therefore monitored. Tube degradation can arise from a number of causes, e.g., corrosion, vibration, etc. Therefore, it has been the practice to periodically inspect the tubes, so that tubes exhibiting a defined degree of degradation can be identified and repaired before being placed back in service. Because of the number of tubes and the environment in which they have to be inspected, the inspection process can be extremely costly.
Second generation nuclear steam generators have been designed to be less susceptible to various modes of tube degradation than their first generation counterparts. Second generation steam generators are found both as original equipment on newer power plants and as replacements for first generation units. The increased resistance of the new generation of steam generators to tube corrosion offers the opportunity for nuclear utilities to consider reducing the frequency and, possibly, the number of tubes inspected. Because steam generator tubing is “safety significant” in the sense that challenges to tubing integrity can affect the probability of core damage in the unlikely event of certain postulated accidents, the reduction of inspection sampling currently common for first generation steam generators must be art done in a manner that engenders a high degree of confidence that safety will not be compromised.
A “risk-informed” approach offers one potential avenue for reducing the frequency and amount of inservice inspection of second-generation steam generator tubing. The United States Nuclear Regulatory Commission, which has regulatory authority over the subject issue, is committed to a risk-informed approach to reducing the operational costs of achieving acceptable safety levels, e.g., RG 1.174, U.S. Nuclear Regulatory Commission, “An Approach Using Probabilistic Risk Assessment in Risk-Informed Decisions On Plant-Specific Changes To The Licensing Basis,” July 1998. Essentially, the risk-informed approach supplants or augments, usually the latter, traditional deterministic engineering design and structural analysis methods with probabilistic methods. Because risks are explicitly evaluated, there is less need to incorporate conservatism and the result can be a significant reduction in safety-related inspection or testing without impairing safety. In the present case, there is a reason to believe that much of the safety-related inspection thought necessary for first generation tubing is an unnecessary expense for second generation tubing. Risk-informed methods can potentially be applied to determine just how far a specific nuclear plant can go in reducing these costly inspections while maintaining or, possibly enhancing, acceptable safety.
Current steam generator tube integrity guidelines, NEI 97-06, Revision 1B (Draft), “Steam Generator Program Guidelines,” Nuclear Energy Institute, Washington, D.C. (April 2000) and EPRI TR-107621-R1, Electric Power Research Institute, “Steam Generator Integrity Assessment Guidelines: Revision 1”, March 2000, call for performing a condition monitoring evaluation at each steam generator inspection. This is described as a backward-looking analysis of the inspection results. The primary objective of the condition monitoring analysis is to establish that the most limiting inspected steam generator tubes do not violate a structural limit based on “. . . a minimum burst pressure of 3 times the normal operating pressure” that is determined through engineering analysis. Tangible outputs of the condition monitoring analysis include the aforementioned structural limit expressed as a fraction or percent of the tube wall thickness and, typically, a set of statistics—the mean and standard deviation—on the “throughwall” growth rates per effective full power year (EFPY),” and a frequency distribution on the depths of all indications found. EFPY is the time period over which the steam generator saw service that equals the amount of full service the steam generator would have experienced if it was operated continuously over a full year.
Sampling protocols for inspections differ substantially in practice but the Electric Power Research Institute (EPRI) Pressurized Water Reactor Steam Generator Inspection Guidelines, EPRI TR-107569-VIR5, Electric Power Research Institute (EPRI), “PWR Steam Generator Examination Guidelines,” Rev 5, Vol. 1, September 1997, can be taken as representative of the current state of the art. The EPRI inspection guidelines recommend a “triple sample plan,” which to the extent pertinent, can be summarized as follows:
(1) Take a sample of 20% of the tubes in a steam generator and inspect for degraded tubes, where the latter are tubes where the maximum indication of a degradation falls between some minimum threshold depth, nominally 20%, and the maximum depth beyond which the tube must be repaired, nominally 40%. A degradation beyond 40% of the tube's through-wall thickness is required to be repaired before the tube can placed back in service.
(2) “Accept”, i.e., stop sampling, the tubes if the fraction of tubes found to be degraded falls below a minimum criterion of 5%. If the fraction found degraded falls between the minimum and maximum criteria, i.e., 5%-10%, then take a second sample of 20% of the tubes. “Reject” the steam generator tubes, i.e., sample 100% the steam generator tubes, if the fraction of the sample found to be degraded exceeds a maximum criterion of 10% of the tubes.
(3) Cumulate the fraction found degraded in the first and second samples and utilize the same minimum and maximum criterion and decision rule on the second sample. If the cumulative degraded number of tubes fall between minimum and maximum criterion, then take a third and final sample of an additional 20% of the tubes.
(4) If the cumulative fraction degraded is less than or equal to five percent of the total tubes sampled, then accept the inspection as being complete. Otherwise, inspect all the remaining tubes of that steam generator. Further, if at anytime the steam generator's tube lot, i.e., all the tubes in the steam generator that are inspected, is rejected, open another steam generator not originally scheduled for inspection and repeat the above sampling plan on this additional steam generator.
In a typical four-loop plant, i.e., a plant with four steam generators, two steam generators come up for inspection every refueling outage, for example, approximately every 18 months.
The steam generator integrity assessment guidelines, cited above, also call for an “operational assessment,” described as a forward-looking analysis whose primary objective is to determine that the aforementioned structural limit will not be exceeded before the next scheduled inspection. The recommended approach of the EPRI Risk Informed Inspection document, EPRI TR-114736-V1, Electric Power
Balkey Kenneth R.
Keating Robert F.
Kotwicki Philip J.
Perdue Robert K.
Bhat Aditya S
Westinghouse Electric Company LLC
LandOfFree
Method of optimizing risk informed inspections of heat... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of optimizing risk informed inspections of heat..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of optimizing risk informed inspections of heat... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3270635