Hydraulic and earth engineering – Foundation – Columnar structure
Reexamination Certificate
2006-10-10
2010-10-19
Lagman, Frederick L (Department: 3672)
Hydraulic and earth engineering
Foundation
Columnar structure
C405S232000, C405S253000, C052S745170
Reexamination Certificate
active
07815399
ABSTRACT:
A method of mechanized construction has developed for installing an earth wire under-bracing by using an auger crane and adjustable excavating unit with an auger crane. The extendable excavating unit is mounted to the lower end of an auger shaft of the auger crane and excavation teeth extendable and retractable are mounted to the excavating unit, thereby allowing excavation of a burial hole suitable to the size of the earth wire under-bracing. Whether it is needed to bury the earth wire under-bracing having a larger diameter than the diameter of excavation existing on the auger crane, or bury small-sized earth wire under-bracing, a method for mechanized construction of the earth wire under-bracing is enabled without difficulty by using an auger crane and adjustable excavating unit.
REFERENCES:
patent: 4016944 (1977-04-01), Wohlfeld
patent: 2008/0295363 (2008-12-01), Kwon
patent: 2009/0035070 (2009-02-01), Kwon
patent: 2001073664 (2001-03-01), None
Kwon Sae Won
Park Dong Hwan
Shin Dong Hwi
Daewon Electric Co. Ltd.
GWiPS
Lagman Frederick L
LandOfFree
Method of mechanized construction for earth wire... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of mechanized construction for earth wire..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of mechanized construction for earth wire... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4175671