Method of manufacturing an item of build-to-order equipment

Data processing: financial – business practice – management – or co – Miscellaneous

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C705S007380, C700S215000, C700S225000, C700S226000, C700S227000

Reexamination Certificate

active

07403927

ABSTRACT:
A method of manufacturing a build-to-order PC system unit having at least one hardware component, e.g. motherboard, bearing a unique identifier (“component ID”) in software readable form. The method comprises generating a digital identifier (“system trackcode”) which defines the hardware and software configuration of the item, storing the system trackcode in association with the component ID in a manufacturing database such that the component ID can be used as a key to retrieve the associated system trackcode. During manufacture the component ID is read from the motherboard and used to retrieve the associated system trackcode from the database.

REFERENCES:
patent: 5311424 (1994-05-01), Mukherjee et al.
patent: 5586038 (1996-12-01), Nagaoka
patent: 5894571 (1999-04-01), O'Connor
patent: 6006203 (1999-12-01), Ushiki
patent: 6161052 (2000-12-01), Charlton et al.
patent: 6236901 (2001-05-01), Goss
patent: 6314337 (2001-11-01), Marcum
patent: 6381509 (2002-04-01), Thiel et al.
patent: 6449579 (2002-09-01), Nikazm et al.
patent: 7073050 (2006-07-01), Chen et al.
patent: 2002/0091456 (2002-07-01), O'Connor
patent: 2004/0172159 (2004-09-01), Noda et al.
patent: 2004/0249606 (2004-12-01), Hoppes et al.
patent: 0520923 (1992-12-01), None
patent: 2353373 (2001-02-01), None
patent: 2353374 (2001-02-01), None
patent: 2357600 (2001-06-01), None
patent: 980486 (1999-03-01), None
patent: 2003127031 (2003-05-01), None
Microsoft Press Computer Dictionary, Third Edition, Microsoft Press, Redmond, 1997, p. 95.
Dahlback, A., et al., “Bar Code Aids Volvo's Drive for Quality Customization” (Abstract only), ID Systems European Edition, vol. 4, No. 3, p. 20, Mar. 1996.
Anon., “Safewww Launches Authentication System,” Online Reporter, Nov. 27, 2000.
Anon., “Upgraded Tracking Tool,” Logistics Management and Distribution Report, vol. 40, No. 5, p. 83, May 2001.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of manufacturing an item of build-to-order equipment does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of manufacturing an item of build-to-order equipment, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of manufacturing an item of build-to-order equipment will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3969111

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.