Mining or in situ disintegration of hard material – Tunnel recovery of fluid material
Patent
1978-03-01
1980-03-25
Purser, Ernest R.
Mining or in situ disintegration of hard material
Tunnel recovery of fluid material
299 13, 299 19, E21C 4110
Patent
active
041947886
ABSTRACT:
An in-situ retort is formed in an oil shale deposit by a sublevel caving method in which the starting slot for the sublevel caving is at opposite ends of the retort on adjacent sublevels. Any zones of high permeability that are formed adjacent to the starting slots are limited in vertical extent to the vertical spacing of the sublevels and are spaced from the zones of high permeability in adjacent sublevels by the length of the retort. A source of channeling through the retort that is caused by the usual sublevel caving mining method is thereby eliminated.
REFERENCES:
patent: 3001776 (1961-09-01), Van Poollen
patent: 4017119 (1977-04-01), Lewis
patent: 4106814 (1978-08-01), French
"SME Mining Engineering Handbook", 12.15--Sublevel Caving, pp. 12-222 to 12-233.
Gulf Oil Corporation
Purser Ernest R.
LandOfFree
Method of forming a rubblized in-situ retort does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of forming a rubblized in-situ retort, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of forming a rubblized in-situ retort will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-1399487