ABSTRACT:
The present invention is directed to a method of designing and fabricating a circuit layout which revolutionizes the manner by which critical weights of a circuit layout are assessed. In accordance with exemplary embodiments, a critical path is assessed on the basis of both a physical delay associated with a data propagation path and with respect to any clock skew which exists with respect to the data propagation path. A critical path can be a path having the shortest physical length from an input node to an output node if the clock skew along this path results in a high probability of a race condition. In accordance with exemplary embodiments, clock skew is assessed by determining the time differential between the arrival of a clock signal at a given data source instance and the arrival of a clock signal at a given data destination instance.
REFERENCES:
patent: 4908772 (1990-03-01), Chi
patent: 5003256 (1991-03-01), Merrill
patent: 5128871 (1992-07-01), Schmitz
patent: 5204559 (1993-04-01), Dehimy et al.
patent: 5224056 (1993-06-01), Chene et al.
patent: 5235566 (1993-08-01), Merrill
patent: 5237514 (1993-08-01), Curtin
patent: 5367469 (1994-11-01), Hartoog
patent: 5402357 (1995-03-01), Schaefer et al.
Timing Optimization of Combinational Logic, IEEE 1988.
Clock Layout for High-Performance ASIC Based on Weighted Center Algorithm, IEEE 1991.
Fiul Dan
Teska Kevin J.
VLSI Technology Inc.
LandOfFree
Method of finding a critical path in a circuit by considering th does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of finding a critical path in a circuit by considering th, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of finding a critical path in a circuit by considering th will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2151591