Method of erecting a cable stayed bridge

Bridges – Transportable

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

14 18, 14 21, 14 27, 14 77, E01D 2104

Patent

active

046620192

ABSTRACT:
A cable stayed bridge is constructed as having approach deck spans and at least one cable stayed deck bridge section assembled as a unit by employing the deck surfaces of the approach spans as in situ work surfaces for erecting equal deck lengths of the unit. A bridge pylon is supported on a floatable support and extends through an open gap provided in an approach span deck, and cable stays are extended from the pylon for supporting the deck lengths. The completed unit is moved away from the work surfaces and into alignment with a last of the approach spans, and is permanently anchored in place.

REFERENCES:
patent: 508929 (1893-11-01), Fontaine
patent: 1850507 (1932-03-01), Larsson
patent: 3570207 (1971-03-01), Launay
patent: 3685074 (1972-08-01), Marshall et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of erecting a cable stayed bridge does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of erecting a cable stayed bridge, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of erecting a cable stayed bridge will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2392042

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.