Method of constructing the approach and main spans of a cable st

Bridges – Transportable

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

14 18, 14 77, E01D 2104

Patent

active

047992794

ABSTRACT:
A method of constructing the approach and main spans of a cable stayed segmental bridge as the main span is constructed as a smooth continuation of the approach spans without the need for special equipment or different box girder deck sections. The approach spans are constructed each in succession from opposite sides of the main span after which the main span continues from opposite sides toward a midpoint, while the cable stays are installed. For a two-wide box girder bridge, delta frames interconnect side-by-side box girders at the anchor locations of the cable stays for thereby transferring the static and dynamic loads of the main span toward the center plane of support of the cable stays.

REFERENCES:
patent: 3299191 (1967-01-01), Mantscheff et al.
patent: 3382680 (1968-05-01), Takano
patent: 3448511 (1969-06-01), Suter
patent: 3571835 (1971-03-01), Buchler
patent: 3832748 (1974-09-01), Ogletree
patent: 3882564 (1975-05-01), Muller
patent: 3902212 (1975-09-01), Muller
patent: 3937165 (1976-02-01), Thivans
patent: 3975476 (1976-08-01), Finsterwalder
patent: 3989218 (1976-11-01), Muller
patent: 4087220 (1978-05-01), Koss
patent: 4103861 (1978-08-01), Buchler et al.
patent: 4319374 (1982-03-01), Schambeck
patent: 4352220 (1982-10-01), Wittfoht
patent: 4513465 (1985-04-01), Schambeck
The Construction Specifier, Apr. 1980.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method of constructing the approach and main spans of a cable st does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of constructing the approach and main spans of a cable st, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of constructing the approach and main spans of a cable st will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-412660

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.