Method for working steeply dipping vein ores with vertically dow

Mining or in situ disintegration of hard material – Processes – Stabilizing underground structure

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

299 19, F21C 4100

Patent

active

051373378

ABSTRACT:
The invention relates to a cut-and fill method of a mine, where the working is done by pillar working, which propagates vertically downwards. The working is done by placing the stope and the pillars interlaced with each other when propagating downwards. The pillars are made by the hardening fill-method and likewise, at the bottom of the excavated stope, in the lower corners, a bed of hardening fill is made.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for working steeply dipping vein ores with vertically dow does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for working steeply dipping vein ores with vertically dow, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for working steeply dipping vein ores with vertically dow will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-342522

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.