DESCRIPTION:

BRIEF SUMMARY
BACKGROUND OF THE INVENTION

The present invention relates to a method for thawing out road culverts choked with ice and also relates to an apparatus for carrying out said method.
A common problem in connection with winter maintenance is that road culverts become completely choked with ice, which makes it impossible to drain melted ice through the road culverts in warm weather, and especially by the spring flood. If such a road culvert that is completely choked with ice is not thawed out before the spring flood this may cause serious flooding and also a danger of parts of the road way being washed away.
In order to prevent the above mentioned, serious consequences of a road culvert choked with ice it is presently common practice to continously inspect road culverts which by experience are known to cause problems. When a road culvert choked with ice is found during such a periodical inspection, the procedure is presently to send out a clearing partrol, usually two persons, by car for thawing out the road culvert in question. Today steam generators are mostly used for thawing out road culverts in this manner, although attempts have also been made to use conventional building dryers. Already from the above it is clear that the thawing out of a road culvert in the conventional manner brings about relatively high costs which apart from transport costs also include wage costs for two persons and the cost for the steam generator.
Apart from the fact that the conventional clearing method discussed above is relatively expensive it also suffers from a number of more or less serious disadvantages that are clear from the following general description of the presently employed method using steam thawing. As indicated above a steam generator is transported out to the working place on a lorry or the like, and when the ends of the road culvert have been exposed the steam generator is started and is connected through hoses to steam pipes used for the thawing. In certain cases it is only necessary to thaw out a smaller passage through the culvert, whereupon the flow of water through this smaller passage continues to widen the passage in the ice until the culvert is completely cleared. In such a case it is, for obtaining the best result, absolutely necessary that the first thawing out of the smaller passage is carried out relatively close to the upper portion of the road culvert since the water will eat its way down through the ice towards the bottom of the culvert. Since road culverts may have a length of up to 15-20 meters, depending upon the width of the road, such a thawing out of a first small passage through the entire length of the road culvert is very difficult to achieve with a satisfactory result by means of a steam pipe. The reason for this is that if the steam pipe has such a length that it may reach through the entire length of the road culvert it will not be possible to keep it close to the upper portion of the road culvert throughout the entire length thereof and accordingly the steam pipe will deflect such that in the worst case it will leave the culvert close to its bottom. Accordingly it may also happen that the steam pipe will be stopped and cannot be brought through the entire length of the road culvert in case stones have fallen into the road culvert and remained therein on the bottom of the culvert.
In other cases it is not sufficient to thaw out only a smaller passage in the road culvert in order to avoid flooding, and therefore it will be necessary to clear the whole culvert in order to avoid the risk that a smaller passage is frozen again. It will also be realized that in the above discussed case where it proves impossible even to thaw out a first small passage in the road culvert by means of a steam pipe, it may become necessary to clear the whole culvert. In such a case when the whole culvert is to be cleared the procedure is such that a number of unperforated steam pipes, being upon in the outer end and having a length of approximately 3 meters are successively introduced from the outlet side of t

REFERENCES:
patent: 596062 (1897-12-01), Firey
patent: 678118 (1901-07-01), Kruschke
patent: 926092 (1909-06-01), Bright
patent: 2029630 (1936-02-01), McMichael
patent: 2676607 (1954-04-01), Carr et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for thawing out road culverts choked with ice does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for thawing out road culverts choked with ice, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for thawing out road culverts choked with ice will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-801016

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.