Method for removal of broken ground

Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Boring

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

405267, 405137, E02D 2900, E21D 912

Patent

active

049001914

ABSTRACT:
In order to avoid the time-consuming transport by road or rail vehicles, in many cases, overburden is pumped to the outside of a tunnel under construction, where it is dumped onto dump-hills. In order to avoid such dump-hills as well as extended transport distances, according to the invention it is disclosed that the overburden is transported, dumped or stored, via channels drilled into the wall of the tunnel, inside of the mountain surrounding the tunnel, and also to transport the overburden, in case of a tunnel to be constructed under a waterway, by means of a pipe into the waterway or to the surface of the waterway.

REFERENCES:
patent: 2233872 (1941-03-01), Proctor
patent: 3334945 (1967-08-01), Bartlett
patent: 3386251 (1968-06-01), Casagrande et al.
patent: 3616855 (1971-11-01), Colgate
patent: 4101333 (1978-07-01), Wayment
patent: 4370077 (1983-01-01), Colgate
patent: 4666346 (1987-05-01), MacLeod

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for removal of broken ground does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for removal of broken ground, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for removal of broken ground will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1163945

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.