Hydraulic and earth engineering – Earth treatment or control – Compaction
Reexamination Certificate
2006-11-20
2010-06-22
Kreck, John (Department: 3672)
Hydraulic and earth engineering
Earth treatment or control
Compaction
C405S263000, C405S036000
Reexamination Certificate
active
07740419
ABSTRACT:
A method of improving soft ground, capable of effectively restricting settlement of a peripheral part of ground to be improved involved in improvement of the soft ground. A vertical supply path is formed by placing a vertical drain material in ground in the periphery of ground to be improved, and water containing a water stop material is charged in the vertical supply path to supply the water containing the water stop material to the ground through the vertical supply path. Then the water stop material charged in the vertical supply path follows a water flow and spreads in the periphery of the vertical supply path to form a water stop zone. The water stop zone formed by the water stop material prevents the movement of ground water in the ground and restricts lowering of the ground water in the ground caused by forced drainage from ground to be improved, effectively restricting settlement of the ground involved in improvement of soft ground.
REFERENCES:
patent: 3371492 (1968-03-01), Tadashi Mise et al.
patent: 3919849 (1975-11-01), Hessert et al.
patent: 4309129 (1982-01-01), Takahashi
patent: WO 2005/113901 (2005-05-01), None
Bemko Taras P.
Hiroe & Associates
Kreck John
Maruyama Kougyo Kabushikikaisha
LandOfFree
Method for improving soft ground does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for improving soft ground, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for improving soft ground will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4154115