Method for evaluating a transformer design

Data processing: database and file management or data structures – Database design – Data structure types

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C707S793000, C707S793000, C707S793000, C707S793000, C707S793000, C707S793000

Reexamination Certificate

active

10699468

ABSTRACT:
A preferred method for evaluating a transformer design using data representing test results from a plurality of transformers and stored in a data base includes comparing the data representing test results to predetermined criteria for the test results to determine whether the test results satisfy the predetermined criteria. The preferred method also includes counting the number of the test results that do not satisfy the predetermined criteria, and generating an indication that a predetermined quantity of the test results do not satisfy the predetermined criteria if at least the predetermined quantity of the test results do not satisfy the predetermined criteria.

REFERENCES:
patent: 5311438 (1994-05-01), Sellers et al.
patent: 5463555 (1995-10-01), Ward et al.
patent: 5604892 (1997-02-01), Nuttall et al.
patent: 5835764 (1998-11-01), Platt et al.
patent: 6167403 (2000-12-01), Whitmire et al.
patent: 6304095 (2001-10-01), Miyamoto
patent: 6311178 (2001-10-01), Bi et al.
patent: 6311179 (2001-10-01), Agarwal et al.
patent: 6324523 (2001-11-01), Killeen, Jr. et al.
patent: 6345259 (2002-02-01), Sandoval
patent: 6477521 (2002-11-01), Kuomura et al.
patent: 6536012 (2003-03-01), Mizuno
patent: 6633772 (2003-10-01), Ford et al.
patent: 6636862 (2003-10-01), Lundahal
patent: 6643652 (2003-11-01), Helgeson et al.
patent: 6708186 (2004-03-01), Claborn et al.
patent: 6795860 (2004-09-01), Shah
patent: 6954751 (2005-10-01), Christfort et al.
patent: 2001/0042092 (2001-11-01), Kudo et al.
patent: 2002/0049749 (2002-04-01), Helgeson et al.
patent: 2002/0073080 (2002-06-01), Lipkin
patent: 2002/0073236 (2002-06-01), Helgeson et al.
patent: 2002/0138617 (2002-09-01), Christfort et al.
patent: 2002/0143598 (2002-10-01), Scheer
patent: 0 567 291 (1993-10-01), None
patent: 0 721 625 (2002-04-01), None
patent: WO 95/09387 (1995-04-01), None
patent: WO 98/57285 (1998-12-01), None
patent: WO 99/15979 (1999-04-01), None
patent: WO 00/72145 (2000-11-01), None
patent: WO 01/02928 (2001-01-01), None
patent: WO 01/50405 (2001-07-01), None
Geromel et al., “The Application of Intelligent system in power Transformer Design”, IEEE, 2002, pp. 285-290.
Doulamis et al., “A Synergetic Neural Network-generic Scheme for Optimal Transformer Construction”, IOS Press, 2002, pp. 37-56.
Meinert et al., Inrush-Modeling of a single-phase 1-MVA-HTS (High Temperature Superconducting)-Transformer for Rail Vehicles, IEEE, Jul. 2003; pp. 2379-2386.
Zhou Zexin et al., “Dynamic Simulation Inspection Test for Protection Equipment in China”, IEEE, 2002, pp. 280-284.
Aldred, K., “Aerospace Manufacturer takes off with Paperless Manufacturing System”,IEEE Solutions, 1998, 55-57.
Chase, N., “Paperless Manufacturing Pays Off”,Quality, Nov. 1998, 46-47.
deSpautz, J., “Quantifying the Benefits of Automation”,ISA Transactions, 1994, 33, 107-112.
Eckerson, W., “Paperfree Factory gets Patriot Flying”,Network World, 8(52), 2 pages.
Fouhy, k. et al., “Paperless Batch Plants become a Reality”,Chemical Engineering, 1995, 31-33.
Fuller, L.F. et al., “A Joint Industry—university CIM Project for University Microelectronics Manufacturing”,IEEE, 1991, 37-40.
Gould, L., “Data Collection Leads to Paperless Manufacturing”,Managing Automation, May 1993, 48-49.
Jain, H.K. et al., “E-R Approach to Distributed Heterogeneous Database Systems for Integrated Manufacturing”,Information Resources Management Journal, 1992, 3(1), 21-29.
Johanson, D.C. et al., “Application of a B&W Developed Computer Aided Pictorial Process Planning System to CQMS for Manufacturing Process”,Supercollider 4, 1992, 513-516.
Haverson, D.S., RS/6000 Drives Paperless Manufacturing,Applied Solutions, 21-22.
Han, M.H. et al., “Flow Control in Flexible Manufacturing: Minimization of Stockout Cost”,Int. J. Prod. Res., 1989, 27(4), 701-715.
Lindo, W., “Workflow Management und Optimierung der Geschaftsprozesse”,ZWF, 1996, 91, 419-420.
Naylor, A.W. et al., “Design of Integrated Manufacturing System Control Software”,IEEE Transactions on Systems, Man, and Cybernetics, 1987, 17(6), 881-897.
Ram, S.N. et al., “Paperless Manufacturing for IC Assembly”,IEEE/SEMI Int'l Semiconductor Manufacturing Science Symposium, 1992, 90-93.
Remson, M.G., “Paperless Manufacturing, A Challenge Now and in the Future”,IEEE/SEMI Int'l Semiconductor Manufacturing Science Symposium, 1991, 89-94.
Saad, et al., “Effectiveness of Dynamic Rescheduling in Agent-Based Flexible Manufacturing Systems”,SPIE, 3203, 88-99.
Vasilash, G.S., “Meeting the Future Head-on (Machinery Manufacturing)”,Production, Jul. 1993, 50-55.
Vide, J.J. et al., “FMS Work Flow Optimization”,Proceedings of the 1986 Summer Computer Simulation Conference, 1986, 705-710.
von Hardenberg, P.W. et al., “Use of Integrated Knowledge-Based Systems for Helicopter Design and Manufacturing”,American Helicopter Society 51stAnnual Forum, 1995, 1-10.
Shop Solutions-“Islands of Automation have Paperless Links”,Manufacturing Engineering, 1997, 134-136.
“Revamping Manufacturing”,Computer-Aided Engineering, 1995, 10-11.
Min-Hong, H., “Work Flow Control in Automated Manufacturing”, Georgia Institute of Technology.
Dewhurst, F. et al., “Towards Integrated Manufacturing Planning with Common Tool and Information Sets”,International Journal of Operations&Production Management, 2001, 21(11), 1460-1482.
Fung, R.Y.K. et al., “Adaptive Production Scheduling of Virtual Production Systems Using Object-Oriented Petri Nets with Changeable Structure”,Intl. J. Prod. Res., 2002, 40(8), 1759-1785.
Greenwell, R.M. et al., “Computer-aided Acquisition of Manufacturing Information”,Advances in Engineering Software, 1994, 20, 1-12.
Guide, Jr., V.D.R. et al., “Rough-cut Capacity Planning for Remanufacturing Firms”,Production Planning&Control, 1997, 8(3), 237-244.
Hitomi, K., “Strategic Integrated Manufacturing Systems: The Concept and Structures”,International Journal of Production of Economics, 1991, 25, 5-12.
Jain, H.K. et al., “E-R Approach to Distributed Heterogeneous Database Systems for Integrated Manufacturing”,Information Resource Management Journal, 1992, 3(1), 21-29.
Jean-Luc, G., “Automated Shop Floor Control System and Method of Operation Thereof”,Patents Alert, 5530857, p. 87.
Naylor, A.W., et al., “Design of Integrated Manufacturing System Control Software”,IEEE Transactions on Systems, Man, and Cybernetics, 1987, SMCI7-(6), 881-897.
Oreshin, K.P. et al., “Integrated Multilevel System for Control of Production of the KAMAZ Work Complex”,Soviet Journal of Instrumentation and Control, 1983, 4, 13-15.
Ouelhadj, D. et al., “A Multi-Contract Net Protocol for Dynamic Scheduling in Flexible Manufacturing Systems (FMS)”,Proceedings of the IEEE International Conference on Robotics&Automation, 1999, 1114-1119.
Patkai, B., “A Cooperative Scheduling System for Paper Machinery Manufacturing”,IEEE, 1998, 2518-2521.
Ramaswamy, S.E. et al., “Deadlock-Free Schedules for Automated Manufacturing Workstations”,IEEE Transactions on Robotics and Automation, 1996, 12(3), 391-400.
Roberts, P.D. et al., A Coordination Strategy for Integrated Operations Management and Control,Abstracts, 091, p. 1071.
Saad, A. et al., “Effectiveness of Dynamic Rescheduling in Agent-Based Flexible Manufacturing Systems”,SPIE, vol. 3203, 88-99.
Slomp, J. et al., “A Manufacturing Planning and Control System for a Flexible Manufacturing System”,Robotics&Computer-Integrated Manufacturing, 1993, 10(1/2), 109-114.
Zhu, L. et al., “FMS Job-Shop Scheduling Under Disruptions with Consideration of Time and Sequence Deviation”,Proceedings of the IEEE Internationa

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for evaluating a transformer design does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for evaluating a transformer design, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for evaluating a transformer design will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3952638

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.