Method for dynamically assessing petroleum reservoir...

Wells – Processes – With indicating – testing – measuring or locating

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C166S268000, C702S009000

Reexamination Certificate

active

07963327

ABSTRACT:
Methods for accurately assessing the condition of a petroleum reservoir and designing and implementing a plan of action to increase production and recovery of petroleum from the reservoir. Information is gathered using a unique set of metrics and information gathering techniques and analyzed in a targeted fashion by properly weighting the data in the context of the particular reservoir and goals of the producer. A reservoir rating is generated using asymmetric analysis of metrics and then used to formulate a plan of action. Production architecture (e.g., number, location and manner of constructing oil and injector wells) is then constructed according to the plan of action. Reservoir performance can be continuously monitored and used to verify production and recovery goals and/or provide triggers or alarms to alter production equipment.

REFERENCES:
patent: 3035440 (1962-05-01), Reed
patent: 2002/0013687 (2002-01-01), Ortoleva
patent: 2002/0120429 (2002-08-01), Ortoleva
patent: 2005/0149307 (2005-07-01), Gurpinar et al.
patent: 2005/0209912 (2005-09-01), Veeningen et al.
patent: 2009/0133871 (2009-05-01), Skinner et al.
patent: 2010/0082142 (2010-04-01), Usadi et al.
Saleri et al., “Engineering Control in Reservoir Simulation: Parts I and II”, SPE 18305, 1988.
Saleri et al., “Data and Data Hierarchy”, SPE 21369, pp. 1286-1293, Dec. 1992.
Saleri, “Reservoir Performance Forecasting: Acceleration by Parallel Planning”, JPT, pp. 652-657, Jul. 1993.
Saleri, “‘Learning’ Reservoirs: Adapting to Disruptive Technologies”, JPT, pp. 57-60, Mar. 2002.
Saleri et al., “The Expanding Role of the Drill Bit in Shaping the Subsurface”, JPT, pp. 53-58, Dec. 2003.
Saleri et al., “Shaybah-220: A Maximum-Reservoir-Contact (MRC) Well and Its Implications for Developing Tight-Facies Reservoirs”, SPE Reservoir Evaluation & Engineering, pp. 316-320, Aug. 2004.
Saleri, “Reservoir Management Tenets: Why They Matter to Sustainable Supplies”, JPT, pp. 28-30, Jan. 2005.
Saleri, “Tenets and Diagnostics in Modern Reservoir Management”, 8th International Forum on Reservoir Simulation, Jun. 2005, Stressa, Italy.
Saleri, “The Next Trillion: Anticipating and Enabling Game-Changing Recoveries”, JPT, Apr. 2006.
Saleri, “Haradh III: A Milestone for Smart Fields”, JPT, Nov. 2006.
Saleri, “Dawn in the Desert: Saudi High Tech Paying Off at Ghawar”, Energy Tribune, pp. 15-17, Sep. 2007.
Helman, “The Octopus”, Forbes Energy & Genius, pp. 44-51, Nov. 24, 2008.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for dynamically assessing petroleum reservoir... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for dynamically assessing petroleum reservoir..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for dynamically assessing petroleum reservoir... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2680264

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.