Method for determining well productivity using automatic downtim

Wells – Processes – With indicating – testing – measuring or locating

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

16625002, E21B 4700

Patent

active

058710477

ABSTRACT:
A method is presented to estimate the productivity index, PI, and the well condition, s, of a pumping well utilizing the knowledge of pump runtime versus downtime. Runtime and downtime may be constantly and automatically recorded and transmitted to a central location. A model runtime is computed assuming the two unknowns, PI and s. The model is then compared with the actual runtime data. A nonlinear optimization technique is used to search for the unknown parameters such that the differences between the measured data and the numerically simulated data are minimized in a least-squares fashion. The proposed estimation procedure is an economical and accurate method for monitoring the behavior of a well resevoir system during runtime.

REFERENCES:
patent: 4507055 (1985-03-01), Fair et al.
patent: 5547029 (1996-08-01), Rubbo et al.
patent: 5699246 (1997-12-01), Plasek et al.
L. G. Alexander, "Determination of the Gas-Free Liquid Level and the Annular Gas Flow Rate For a Pumping Well", Apr.-Jun., 1976, The Journal of Canadian Petroleum, pp. 66-70.
James N. McCoy, "Analyzing well performance X", Apr.-Jun., 1978, The Journal of Canadian Petroleum, pp. 80-91.
E. R. Brownscombe, "Afterflows and Buildup Interpretation on Pumping Wells", Feb, 1982, Society of Petroleum Engineers, pp. 397-405.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for determining well productivity using automatic downtim does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for determining well productivity using automatic downtim, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for determining well productivity using automatic downtim will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2055636

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.