Method for determining pore pressure and horizontal effective st

Measuring and testing – Borehole or drilling – Downhole test

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166250, 175 50, E21B 4900

Patent

active

049810375

ABSTRACT:
The porosity-effective stress relationship, which is a fuction of lithology, is used to calculate total overburden stress, vertical effective stress, horizontal effective stress and pore pressure using well log data. The log data can be either real time data derived from measurement-while-drilling equipment or open hole wireline logging equipment.

REFERENCES:
patent: 3907034 (1935-09-01), Suman, Jr.
patent: 4635719 (1987-01-01), Zoback et al.
"Petrophysical-Mechanical Math Model for Real-Time Wellsite Pore Pressure/Fracture Gradient Prediction" by Philip Holbrook and Michael Hauck, SPE 16666, Copyright 1987 for presentation at 62nd Annual Technical Conference and Exhibition of the Society of Petroleum Engineers held in Dallas, TX on Sep. 27-30, 1987.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for determining pore pressure and horizontal effective st does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for determining pore pressure and horizontal effective st, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for determining pore pressure and horizontal effective st will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1990814

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.