Method for determining optimum schedule in computer-aided schedu

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364402, 364408, G06F 1522, G06F 1520

Patent

active

052414655

ABSTRACT:
In a method for determining an optimum scheduling in a computer-aided scheduling system the data associated with a schedule to be generated is previously stored in a memory data. A strategy decision table showing therein one or more scheduling strategies suitable for a plurality of the states in a scheduling process is prepared. An optimization definition table indicating degree of improvement precedence or precedence order of the scheduling strategies of the evaluation items, where degree of improvement precedence is defined as degree of improvement of evaluation value of he evaluation item in changing of the scheduled strategy, is prepared. A schedule is generated by repetition of selecting and executing the scheduling strategies by using the strategy decision table. The other schedules are generated by changing the scheduling strategy selected in the state of the scheduling process by using the optimization definition table. An optimum schedule having the best evaluation value is selected.

REFERENCES:
patent: 5111391 (1992-05-01), Fields et al.
Michael J. Shaw, "Knowledge-Based Scheduling in Flexible Manufacturing Systems: An Integration of Pattern-Directed Inference and Heuristic Search", International Journal of Production Research, vol. 26, No. 5, 1988, pp. 821-844 (Provided in English).

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for determining optimum schedule in computer-aided schedu does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for determining optimum schedule in computer-aided schedu, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for determining optimum schedule in computer-aided schedu will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2302477

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.