Method for determining flexible demand in a manufacturing proces

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364468, G06F 1760, G06G 752

Patent

active

054404800

ABSTRACT:
A system that determines the total demand for a product for each day over four time periods specified by the user of the system. Within the first time period, from the current date up to a demand fence, the total demand cannot be altered. For the next three periods, called the flex fence periods, the total demand for each day can vary by a percentage amount set by the user. If an order exceeding capacity is received for a date beyond the demand fence, the system will recalculate total demand for all days beyond the demand fence and prior to the order date to attempt to produce the total demand quantity necessary to fulfill the order. In calculating the increased quantities, the system uses a formula that prevents the total demand quantity for any day from exceeding the amount of material that was ordered for that day.

REFERENCES:
Costanza, John R., "The Quantum Leap in Speed to Market", J-I-T Institute of Technology, 1990, pp. 89-94.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for determining flexible demand in a manufacturing proces does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for determining flexible demand in a manufacturing proces, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for determining flexible demand in a manufacturing proces will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-976041

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.