Electric power conversion systems – Current conversion – With starting arrangement
Reexamination Certificate
2007-10-29
2010-02-23
Han, Jessica (Department: 2838)
Electric power conversion systems
Current conversion
With starting arrangement
C323S238000
Reexamination Certificate
active
07667989
ABSTRACT:
A method for controlling start time series by stages adopted for use on a power supply consisting of a main power system and a standby power system. The power supply includes an energy storage unit to store a judgment power. The method mainly includes: setting a start voltage, setting a boosted voltage, getting a judgment power voltage and detecting whether the judgment power has reached the start voltage or the boosted voltage, and alternately starting the standby power system and the main power system. Thus the main power system and the standby power system are started at different time series. In terms of the energy storage unit the load increases by stages. Therefore the energy storage unit can be charged to increase the judgment power voltage and increase loading by stages. As a result, inrush current also rises by stages and can be harnessed as desired.
REFERENCES:
patent: 4697229 (1987-09-01), Davy et al.
patent: 5267135 (1993-11-01), Tezuka et al.
patent: 5689407 (1997-11-01), Marinus et al.
patent: 5861737 (1999-01-01), Goerke et al.
Andyson International Co., Ltd.
Han Jessica
Muncy Geissler Olds & Lowe, PLLC
LandOfFree
Method for controlling start time series by stages does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for controlling start time series by stages, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for controlling start time series by stages will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4222544