Method for building a road bed and the use of the same

Road structure – process – or apparatus – Process – Sequential construction of diverse layers

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

14 24, 264309, 405182, E01D 700, E04B 132

Patent

active

053801237

ABSTRACT:
A method for building a road bed by providing a plurality of vaulted structures located at a road bed site. A first layer of concrete is applied on the structures for reinforcing the structures. The structures can be comprised of a profiled steel plate or a sheet metal mesh. They may have reinforcement braces comprised of troughs or corrugations provided on an outer surface of the structures which receive the first layer of concrete. The first layer of concrete is allowed to set before a second layer of concrete is applied to the structures and to the first layer to form a concrete casing.

REFERENCES:
patent: 597590 (1898-01-01), Pratt
patent: 1864598 (1932-06-01), Kessler
patent: 2315895 (1943-04-01), Crom
patent: 2425079 (1947-08-01), Billig
patent: 2686421 (1954-08-01), Barron
patent: 2964821 (1960-12-01), Meehan
patent: 3622656 (1971-11-01), Dewey et al.
patent: 3751929 (1973-08-01), Bernold
patent: 3776990 (1974-12-01), Watkins, Jr. et al.
patent: 4155967 (1979-05-01), South et al.
patent: 4211504 (1980-08-01), Sivachenko
patent: 4587684 (1986-05-01), Miller
patent: 4597925 (1986-07-01), Loggy
patent: 4618283 (1986-10-01), Hilfiker
patent: 4695187 (1987-09-01), Mikhailovsky et al.
patent: 4890993 (1990-01-01), Wilson

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for building a road bed and the use of the same does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for building a road bed and the use of the same, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for building a road bed and the use of the same will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-846748

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.