Method for allocating limited component supply and capacity...

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Reexamination Certificate

active

09891850

ABSTRACT:
A method and system for resource rationing which employs decision rules for the optimal allocation of supply and capacity over time that satisfy two key requirements (a) being consistent with accepted operational objectives (e.g. low inventory, short lead times, prioritized allocation of supply and capacity) and (b) allowing for the timely computation of a feasible production schedule. The method and system is generally characterized in that it is able to divide each of the priority ranked scheduled releases (Material Requirements Planning (MRP)) into “N” separate and smaller sized scheduled releases where the priority of each of the “N” releases may be equal to the priority of the original release. The “N” separate and smaller sized scheduled releases are sorted according to priority and then used to determine an optimal supply schedule for allocating resources including component supply and assembly capacity.

REFERENCES:
patent: 4015366 (1977-04-01), Hall, III
patent: 5235508 (1993-08-01), Lirov et al.
patent: 5548518 (1996-08-01), Dietrich et al.
patent: 5630070 (1997-05-01), Dietrich et al.
patent: 5787000 (1998-07-01), Lilly et al.
patent: 5943484 (1999-08-01), Milne et al.
patent: 5971585 (1999-10-01), Dangat et al.
patent: 6031984 (2000-02-01), Walser
patent: 6041267 (2000-03-01), Dangat et al.
patent: 6049742 (2000-04-01), Milne et al.
patent: 6571215 (2003-05-01), Mahapatro
patent: 6606527 (2003-08-01), de Andrade et al.
patent: 6941514 (2005-09-01), Bradford
patent: WO9713211 (1997-04-01), None
Larry “Supply Chain Planning Optimization Just the Facts”; May 1998; The Report on Supply Chain Management; pp. 3-40.
Cheng et al “Production Scheduling of Continuous Flow Lines: Multiple Products With Setup Times and costs”, Dec. 1998, Production and Operation Management, vol. 7, No. 4.
Faaland et al “Scheduling Tasks With Due Dates in a Fabrication/Assembly Process”, May 1998, University of Washington, Seattle, Washington, pp. 378-383.
Orlicky, J., “Material Requirements Planning”, 1993, McGraw Hill.
Hopp, W. J., and Spearman, M.L., “Factory Physics Foundations of Manufacturing Management”, 1996, Irwin, Chicago, 135-141.
Leachman, R.C., Benson, R.F., Liu, C., and Raar, D.F., 1996, “IMPRESS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation—Semiconductor Sector”, Interfaces, 26, 1, 62-64.
Sullivan, G., and Fordyce, K., 1990, “IBM Burlington's Logistics Management System”, Interfaces, 20, 1, 43-64.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for allocating limited component supply and capacity... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for allocating limited component supply and capacity..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for allocating limited component supply and capacity... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3736498

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.