Method for accessing bypassed production zones

Wells – Processes – Cementing – plugging or consolidating

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166292, 166297, E21B 4314, E21B 3316

Patent

active

054840180

ABSTRACT:
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well in which a settable material is placed in the annulus between the casing and the tubing above the secondary production zone and allowed to set up, and the secondary zone is then perforated with a through-tubing perforating gun.

REFERENCES:
patent: 2839142 (1958-06-01), Huber
patent: 3130784 (1964-04-01), Pennington, II
patent: 3724550 (1973-04-01), Lanmon, II
patent: 4612992 (1986-09-01), Vann et al.
patent: 4637468 (1987-01-01), Derrick

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for accessing bypassed production zones does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for accessing bypassed production zones, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for accessing bypassed production zones will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-303473

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.