Method and system to gauge and control project churn

Data processing: software development – installation – and managem – Software program development tool – Software project management

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C705S002000

Reexamination Certificate

active

07472373

ABSTRACT:
A computer-implemented method to gauge and control churn of a project may include determining an estimated project churn, wherein project churn includes any identifiable and unplanned changes to a scope of the project. The method may also include identifying at least one task of the project requiring rework or modification. The method may additionally include collecting heuristic information on each task of the project requiring rework or modification in response to any potential project changes for determining the estimated project churn. Collecting heuristic information may include at least one of: collecting a time to complete a same or a similar task in another project; sampling a plurality of times to complete the same or similar task in a plurality of other projects; and surveying a plurality of experienced project managers to provide an estimated time requirement to complete the task. The method may also include entering at least optimistic, pessimistic and expected time requirements for reworking or modifying each task of the project requiring rework or modification in response to any potential project changes. The method may further include allocating resources in response to the estimated project churn based on the collected heuristic information and the at least optimistic, pessimistic and expected time requirements for each task of the project.

REFERENCES:
patent: 5406476 (1995-04-01), Deziel et al.
patent: 5623404 (1997-04-01), Collins et al.
patent: 5826236 (1998-10-01), Narimatsu et al.
patent: 2003/0225748 (2003-12-01), Haeberle

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and system to gauge and control project churn does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and system to gauge and control project churn, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system to gauge and control project churn will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4040022

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.