Method and system for producing a work breakdown structure for a

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Other Related Categories

707100, G07C 100

Type

Patent

Status

active

Patent number

058483942

Description

ABSTRACT:
An automated system and method for producing a work breakdown structure for a project, such as a software development project. The resulting work breakdown structure provides a common framework for communicating cost, scope and schedule information relating to the project. The system includes a function point component list which identifies the files and tables which represent the product to be developed for the project or projects. The function point component list also contains information about the elementary transactions by which each file or table is modified or maintained. The system further includes a work breakdown structure template file, in which a list of identifiable tasks and resources required to accomplish a project is maintained. Using the function point component list and the work breakdown structure template file, the system generates an electronic work breakdown structure output file in which information about the total work required to accomplish the objectives of a project is stored. The information contained in the electronic work breakdown structure output file can be extracted in a user defined format and displayed for a user.

REFERENCES:
patent: 5233513 (1993-08-01), Doyle
patent: 5303170 (1994-04-01), Valko
patent: 5381332 (1995-01-01), Wood
patent: 5414843 (1995-05-01), Nakamura et al.
patent: 5446895 (1995-08-01), White et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and system for producing a work breakdown structure for a does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and system for producing a work breakdown structure for a, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system for producing a work breakdown structure for a will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-190320

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.