Electrical computers and digital processing systems: multicomput – Computer network managing – Computer network monitoring
Reexamination Certificate
2007-05-29
2007-05-29
Wiley, David (Department: 2143)
Electrical computers and digital processing systems: multicomput
Computer network managing
Computer network monitoring
C709S223000
Reexamination Certificate
active
09702160
ABSTRACT:
A system and method are disclosed which predict whether a performance problem within a network is likely to be encountered during future operation. Furthermore, a preferred embodiment not only predicts the likelihood of a performance problem, but further determines the appropriate preventative measures to be taken in an attempt to prevent a predicted performance problem from occurring. In a preferred embodiment, a management system (MS) that oversees the operation of a network is implemented to predict likely performance problems within the network, and may determine appropriate preventative measures for preventing predicted performance problems within the network. Polling gateway(s) may be utilized to periodically poll the network resources in order to retrieve status information for such resources, including but not limited to status of disk(s), database(s), memory, CPU(s), and operating system(s) within the network. The gathered status information is then evaluated by the MS by, for example, correlating such status information with known performance rules for the network to predict potential performance problems, and based on such evaluation, the MS may predict whether a future performance problem is likely to be encountered. Once a future performance problem has been predicted, the MS determines an appropriate preventive action for preventing the performance problem from occurring, and the MS may initiate the appropriate preventive action before the occurrence of the predicted performance problem in an attempt to prevent such performance problem. Most preferably, the network management system is implemented to “learn” symptoms of performance problems over time.
REFERENCES:
patent: 5123017 (1992-06-01), Simpkins et al.
patent: 5615323 (1997-03-01), Engel et al.
patent: 5819028 (1998-10-01), Manghirmalani et al.
patent: 5961598 (1999-10-01), Sime
patent: 6047279 (2000-04-01), Barrack et al.
patent: 6058260 (2000-05-01), Brockel et al.
patent: 6327677 (2001-12-01), Garg et al.
patent: 6353902 (2002-03-01), Kulatunge et al.
patent: 6415189 (2002-07-01), Hajji
patent: 6446123 (2002-09-01), Ballantine et al.
patent: 6456306 (2002-09-01), Chin et al.
patent: 6691067 (2004-02-01), Ding et al.
patent: 6738811 (2004-05-01), Liang
patent: 6765864 (2004-07-01), Natarajan et al.
patent: 6892317 (2005-05-01), Sampath et al.
patent: 2002/0038292 (2002-03-01), Quelene
patent: 2002/0133757 (2002-09-01), Bertram et al.
patent: 2003/0088663 (2003-05-01), Battat et al.
U.S. Appl. No. 09/345,634, filed Jun. 30, 1999, Tentij et al.
U.S. Appl. No. 09/469,026, filed Dec. 21, 1999, Clark et al.
Agilent Technologie,s Inc.
England David
Wiley David
LandOfFree
Method and system for predictive enterprise resource management does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and system for predictive enterprise resource management, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system for predictive enterprise resource management will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3776009