Method and system for optimizing a critical path in a field prog

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364491, 364488, G06F 9455

Patent

active

057649545

ABSTRACT:
In a Field Programmable Gate Array ("FPGA") design system, a configuration is generated. A path of the configuration is selected as a critical path for optimization. The critical path is optimized by rerouting connections between the logical primitives of the critical path. Prior to the rerouting, the logical primitives of the critical path may be optimally placed within the FPGA configuration. Optimal performance of the critical path is thus achieved.

REFERENCES:
patent: 4786154 (1988-11-01), Sliwkowski et al.
patent: 4849904 (1989-07-01), Aipperspach et al.
patent: 4896272 (1990-01-01), Kurosawa
patent: 4918614 (1990-04-01), Modarres et al.
patent: 4939668 (1990-07-01), Brown et al.
patent: 4940908 (1990-07-01), Tran
patent: 4965741 (1990-10-01), Winchell et al.
patent: 5003487 (1991-03-01), Drumm et al.
patent: 5111413 (1992-05-01), Lazansky et al.
patent: 5220512 (1993-06-01), Watkins et al.
patent: 5225991 (1993-07-01), Dougherty
patent: 5237514 (1993-08-01), Curtin
patent: 5251147 (1993-10-01), Finnerty
patent: 5297053 (1994-03-01), Pease et al.
patent: 5341308 (1994-08-01), Mendel
patent: 5598344 (1997-01-01), Dangelo et al.
patent: 5623418 (1997-04-01), Rostoker et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and system for optimizing a critical path in a field prog does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and system for optimizing a critical path in a field prog, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system for optimizing a critical path in a field prog will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2213248

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.