Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management
Reexamination Certificate
2011-03-08
2011-03-08
Sterrett, Jonathan G (Department: 3623)
Data processing: financial, business practice, management, or co
Automated electrical financial or business practice or...
Health care management
Reexamination Certificate
active
07904324
ABSTRACT:
A computer-implemented method and system for assessing schedule performance issues of a project. A Behind Schedule Performance Index (BSPI), an ahead/behind trend graph, a behind schedule report or an ahead of schedule report is generated. The BSPI excludes an ahead of schedule component from the project's scheduled performance index. The ahead/behind trend graph has ahead of schedule and behind schedule indicators indicating that a portion of the project is behind schedule while the project, as a whole, is ahead of schedule. The behind schedule report filters out ahead of schedule tasks and includes only behind schedule tasks. The ahead of schedule report filters out behind schedule tasks and includes only ahead of schedule tasks.
REFERENCES:
patent: 5381332 (1995-01-01), Wood
patent: 5671361 (1997-09-01), Brown et al.
patent: 5907490 (1999-05-01), Oliver
patent: 5923552 (1999-07-01), Brown et al.
patent: 6817613 (2004-11-01), Hasek
patent: 2002/0049621 (2002-04-01), Bruce
patent: 2002/0198926 (2002-12-01), Panter et al.
patent: 2003/0178769 (2003-09-01), Hasek
patent: 2003/0233268 (2003-12-01), Taqbeem et al.
patent: 2004/0030590 (2004-02-01), Swan et al.
patent: 2005/0149927 (2005-07-01), Abe
patent: 2005/0222881 (2005-10-01), Booker
patent: 2006/0044307 (2006-03-01), Song
patent: 2006/0173762 (2006-08-01), Clater
patent: 1 355 245 (2003-10-01), None
patent: 1 355 246 (2003-10-01), None
Earned value project management method and extensions gwu.edu [PDF] FT Anbari—IEEE Engineering Management Review, 2004—gwu.edu.
Connecting earned value to the scheduleearnedschedule.com [PDF] W Lipke—The Measurable News, 2004—earnedschedule.com.
Project portfolio earned value management using treemaps umd.edu [PDF] JH Cable, JF Ordonez, G Chintalapani, C . . . —Proceedings of the . . . , 2004—cs.umd.edu.
Earned value project management QW Fleming, JM Koppelman, JM Oppelman—Crosstalk, 1998.
Is the Earned-Value Method an Enemy of Workflow? YW Kim, G Ballard— . . . Conference of the International Group for . . . , 2000—leanconstruction.org.
Fleisch, et al.; The value of information integration in meeting delivery dates; Journal of Organizational Computing and Electronic Commerce, vol. 11, No. 1; ISSN: 1054-1721, Abstract only.
Office Action (Mail Date Aug. 24, 2010) for U.S. Appl. No. 11/502,721, Filing Date Aug. 10, 2006; First Named Inventor: Gerald Alan Gura; Art Unit 3623; Confirmation No. 1497.
Office Action (Mail Date Sep. 14, 2010) for U.S. Appl. No. 11/517,148, Filing Date Sep. 07, 2006; First Named Inventor: Gerald Alan Gura; Art Unit 3624; Confirmation No. 1715.
Winter, Ron; “White Paper on Using Schedule Analyzer Professional”, Dec. 14, 2002, pp. 1-5.
Check‘n’crash: combining static checking and testing psu.edu [PDF]C Csaliner, Y Smaragdakis - 27th International Conference on . . . , 2005-ieeexplore.ieee.org.
Project Management considerations for Distributed Processing Applications jstor.org [PDF]RG Felix, WL Harrison-MIS quarterly, 1984-JSTOR.
An overview of the extended static checking system psu.ed [PDF]DL Detlefs-Proceedings of the First Workshop on Format Methods . . . , 1996-Citeseer.
An Application of Role-Based Access Control in an Organizational Software Process Knowledge Base dtic.mil [PDF]WA Windhurst, Naval Postgraduate School . . . -2001-oai.dtic.mil.
Model checking programs psu.edu [PDF]W Visser, K Havelund, G Brat, SJ Park, F . . . -Automated Software . . . , 2003-Springer.
Winter, Ron; “Checks and Balances: Baseline Schedule Review”, Oct. 22, 2002, Presented at the 2002 Primavera Users Conference, pp. 1-22.
A high-performance, portable implementation of the MPI Message passing interface standard psu.edu [PDF]W Gropp, E Lusk, N Doss, A Skjellum-Parallel Computing, 1986-Elsevier.
Active database systems psu.edu [PDF]U Dayal, E Hanson, J Widom-Modern Database Systems, 1995-Citeseer.
Snoop: An Event Specification Language for Active Database Systems psu.edu [PDF]D Mishra-1991-Citeseer.
Seaman: Implementing Process-Centered Software Development Environments on Top of an Active Database Management System psu.edu [PDF]D Tombros, A Geppert, KR Dittrich-1995-Citeseer.
Winter, Ron; “119 Schedule Checks is a Complete Review”, Presented at the 2003 PrimaVera Users Conference, Nov. 11, 2003, pp. 1-23. retrieved from the web at: http://ronwinterconsulting.com/raupdate.htm.
The architecture of an active database management system by D McCarthy-1989-Cited by 466-Related articles.
Active database rules with transaction-conscious stable-model . . . by C Zaniolo-1995-Cited by 59-Related articles.
Enforcing high-level protocols in low-level software acm.org [PDF]R DeLine, M Fähndrich-Proceedings of the ACM SIGPLAN 2001 . . . , 2001-portal.acm.org.
International Business Machines - Corporation
Pivnichny John R.
Schmeiser Olsen & Watts
Sterrett Jonathan G
LandOfFree
Method and system for assessing schedule performance issues... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and system for assessing schedule performance issues..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system for assessing schedule performance issues... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2737395