Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Lining
Patent
1977-05-09
1978-09-19
Taylor, Dennis L.
Hydraulic and earth engineering
Underground passageway, e.g., tunnel
Lining
E21D 1122
Patent
active
041143868
ABSTRACT:
A method for removing resilient gallery lining frames in mining and tunnelling, such frames consisting of a number of mutually overlapping lining section segments with a box-like profile, comprises releasing the overlapping section segments from one another in order to recover the respective lining frames. The profile of the section segments has a longitudinal gap and overlapping ends of the segments are braced one with another by a wedge system acting on the longitudinal gap of the inner section, the segments being inserted one within the other in a dissimilar manner. At an overlapping region the outer section segment is bent outwardly to provide an opening at the longitudinal gap therein and the inserted end of the inner section segment at the overlap is moved substantially normal to the opening made by the outward bending to release the overlapping sections from one another.
Radner Gerd
Zillessen Christoph
Ruhrkohle, A.G.
Taylor Dennis L.
LandOfFree
Method and device for removing resilient gallery lining frames i does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and device for removing resilient gallery lining frames i, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and device for removing resilient gallery lining frames i will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2112253