Hydraulic and earth engineering – Earth treatment or control – Ground stabilization or reinforcement
Reexamination Certificate
2005-02-28
2008-03-18
Singh, Sunil (Department: 3673)
Hydraulic and earth engineering
Earth treatment or control
Ground stabilization or reinforcement
Reexamination Certificate
active
07344340
ABSTRACT:
A method is provided for maintaining the structured stability and configuration of golf course sand bunker borders which method comprises excavating the soil area adjacent the bunker edge, rigidly positioning adjacent open-top, uniquely designed compartments in the excavated area along the edge of the bunker, filling the compartment with soil to the top of each compartment and leveling the soil on top of the compartments. Each compartment comprises side panels, front and back panels and a bottom closure panel. The compartment is rigidly positioned by means of spikes driven through the back and front panel into the soil at the edge of the bunker and a spike through the bottom closure into the soil beneath the sand in the bunker.
REFERENCES:
patent: 4960345 (1990-10-01), Hurley et al.
patent: 5108231 (1992-04-01), Rausch
patent: 5154542 (1992-10-01), Klenert
patent: 6663323 (2003-12-01), Boys
patent: 2004/0156679 (2004-08-01), Jenkins et al.
patent: 6-10366 (1994-01-01), None
patent: 8-41959 (1996-02-01), None
Carlson Eric J.
Kenney Timothy E.
Ames Rubber Corporation
Lowenstein & Sandler PC
Singh Sunil
LandOfFree
Method and assembly for maintaining structural stability and... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and assembly for maintaining structural stability and..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and assembly for maintaining structural stability and... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3974892