Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management
Reexamination Certificate
2007-04-30
2010-06-01
Sterrett, Jonathan G (Department: 3623)
Data processing: financial, business practice, management, or co
Automated electrical financial or business practice or...
Health care management
Reexamination Certificate
active
07729939
ABSTRACT:
Individual employees are permitted to be individuals and plan their work as individuals. Individuals are only asked to plan their work within a limited tasking horizon. Employees track their progress using verbs that are designed to capture the reasons behind positive and negative predictive ability. Verbs are analyzed and expected predictive error, also know as risk, is calculated. Once verbs are captured they can be analyzed for ways to improve predictive ability. In addition, the risk can be factored into the initial planning stage so as to include an expected predictive error in the initial planning.
REFERENCES:
patent: 4942527 (1990-07-01), Schumacher
patent: 5016170 (1991-05-01), Pollalis et al.
patent: 5111391 (1992-05-01), Fields et al.
patent: 5255181 (1993-10-01), Chapman et al.
patent: 5321610 (1994-06-01), Breslin
patent: 5406476 (1995-04-01), Deziel et al.
patent: 5467268 (1995-11-01), Sisley et al.
patent: 5530861 (1996-06-01), Diamant et al.
patent: 5671360 (1997-09-01), Hambrick et al.
patent: 5671361 (1997-09-01), Brown et al.
patent: 5692125 (1997-11-01), Schloss et al.
patent: 5760770 (1998-06-01), Bliss et al.
patent: 5765139 (1998-06-01), Bondy
patent: 5765140 (1998-06-01), Knudson et al.
patent: 5767848 (1998-06-01), Matsuzaki et al.
patent: 5798950 (1998-08-01), Fitzgerald
patent: 5818715 (1998-10-01), Marshall et al.
patent: 5836011 (1998-11-01), Hambrick et al.
patent: 5848394 (1998-12-01), D'Arrigo et al.
patent: 5855006 (1998-12-01), Huemoeller et al.
patent: 5893074 (1999-04-01), Hughes et al.
patent: 5923552 (1999-07-01), Brown et al.
patent: 6014633 (2000-01-01), DeBusk et al.
patent: 6023572 (2000-02-01), Lautzenheiser et al.
patent: 6047260 (2000-04-01), Levinson
patent: 6101481 (2000-08-01), Miller
patent: 6192346 (2001-02-01), Green
patent: 6584447 (2003-06-01), Fox et al.
patent: 06 124285 (1994-06-01), None
patent: 10 240827 (1998-11-01), None
patent: WO 99/04370 (1999-01-01), None
patent: WO 00/67118 (2000-11-01), None
AbouRizk, et al.; “Construction Simulation and Distribution Fitting in a Data Deficient Environment”, (C) 1993 IEEE, pp. 493-499.
Cox, Earl, Terlaga, Ray; “A Clear Approach to Fuzzy Logic”, Chief Information Officer Journal. New York: Fall 1992. vol. 5, Iss. 2; p. 32 (6 pages).
Barki, Henri; Rivard, Suzanne; Talbot, Jean; “Toward an assessment of software development risk”, Fall 1993, Journal of Management Information Systems, v10n2, pp. 203-225. Dialog 00813256 94-62648.
Cox, Earl; “Applications of Fuzzy System Models”, Oct 1992, Al Expert, v7, n10, p34(6), Dialog 01532834 12551188.
Kangari, Boozbeh; Riggs, Leland S; “Construction Risk Assessment by Linguistics”, © 1989 IEEE, IEEE, Transactions on Engineering Management, vol. 36, No. 2, May 1989, pp. 126-131.
Guiffrida; Alfred L; Nagi, Rakesh; “Fuzzy Set Theory Applications in Production Management Research: a Literature Survey”, 1998, Journal of Intelligent Manufacturing, 9, pp. 39-56.
Attaran, Mohsen; “The coming age of fuzzy logic in manufacturing & services”, Mar.-Apr. 1996, Journal of Systems Management, v47, n2, p4(9), Dialog 08695294 18304943.
Gowing, et al; “A rational method for assessing irrigation performance at farm level with the aid of fuzzy set theory”, © 1996 Kluwer Academic Publishers, Irrigation and Drainage Systems 10: 310-330.
Duncan, Willam R (ed); “A Guide to the Project Management Body of Knowledge”, © 1996 PMI, p. vi-viii, 1, 31, 60,64-68, 118, 119, 167.
Mon, et al; “Application of fuzzy distributions on project management”, 1995, Fuzzy Sets and Systems 73, 227-234.
Fetz, et al; “Fuzzy models in geotechnical engineering and construction management”, Mar. 1999, Computer Aided Civil and Infrastructure Engineering, 14(2), pp. 93-106.
Using metrics in management decision making G Stark, RC Durst, CW Vowell—Computer, 1994—ieeexplore.ieee.org.
Special Feature: Impact of Schedule Estimation on Software Project Behavior TK Abdel-Hamid, SE Madnick— IEEE Software, 1986—ieeexplore.ieee.org.
A software project dynamics model for process cost, schedule and risk assessment RJ Madachy—1994—sunset.usc.edu.
AbouRizk et al. “Construction Simulation and Distribution Fitting in a Data Deficient Enviroment”, Uncertainty Modeling and Analysis, 1993, Proceedings, Second International Symposium on College Park, MD, USA, Apr. 25-28, 1993, Los Alamitos, Ca, USA, IEEE Computers Soc., Apr. 25, 1993, pp. 493-499.
William R. Duncan, “A Guide to the Project Management Body of Knowledge,” Project Management Institute, 1996; p. 8-10, p. 30-32, p. 42, p. 59-62, p. 70, p. 107-108; p. 157-171.
Bennett Matthew
Clark Douglas
Finwick James
Richardson Sandra
Dickstein & Shapiro LLP
Metier Ltd.
Sterrett Jonathan G
LandOfFree
Method and apparatus for planning and monitoring multiple... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and apparatus for planning and monitoring multiple..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for planning and monitoring multiple... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4246207