Method and apparatus for locating and re-entering one or more ho

Wells – Processes – Parallel string or multiple completion well

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166 50, 1661776, E21B 4314

Patent

active

053259246

ABSTRACT:
In accordance with the present invention, a plurality of methods and devices are provided for solving important and serious problems posed by lateral (and especially multilateral) completion in a wellbore including methods and devices for re-entering selected lateral wells to perform completions work, additional drilling, or remedial and stimulation work. Methods and devices are described for assisting in the location and re-entry of lateral wells using a guide or mandrel structure. Preferably, the re-entry methods of this invention permit the bore size of the lateral wells to be the same or substantially the same bore size as the vertical wells.

REFERENCES:
patent: 2397070 (1946-03-01), Zublin
patent: 2452920 (1948-11-01), Gilbert
patent: 2797893 (1957-07-01), McCune et al.
patent: 2858107 (1958-10-01), Colmerauer
patent: 3330349 (1967-07-01), Owsley et al.
patent: 4396075 (1983-08-01), Wood et al.
patent: 4402551 (1983-09-01), Wood et al.
patent: 4415205 (1983-11-01), Rehm et al.
patent: 4436165 (1984-03-01), Enery
patent: 4444276 (1984-04-01), Peterson, Jr.
patent: 4515213 (1985-05-01), Rogen et al.
patent: 4573541 (1986-04-01), Josse et al.
patent: 4807704 (1989-02-01), Hsu et al.
patent: 5113938 (1992-05-01), Clayton
patent: 5115872 (1992-05-01), Brunet et al.
"Arco drill horizontal drainhole"; Moore III; Sep. 1980.
H. Karlsson, R. Cobbley and G. E. Jacques, New Developments in Short-, Medium-, and Long-Radius Lateral Drilling, 1989, SPE/IADC, pp. 725-736.
G. K. McKown, Drillstring Design Optimization for High-Angle Wells, 1989, SPE/IADC, pp. 275-282.
W. Dickinson, R. G. Knowll, R. Nordlund and W. Dickinson, Flexible Sand Barrier (FSB): A Novel Sand Control System, 1989, Society of Petroleum Engineers, pp. 419-424.
P. A. Goode and D. J. Wilkinson, Inflow Performance of Partially Open Horizontal Wells, 1989, Society of Petroleum Engineers, pp. 309-320.
G. E. King, Perforating The Horizontal Well, Jul. 1989, Journal of Petroleum Technology, pp. 671-672.
J. P. Ashton, J. Liput, R. Leomons and J. Summerlin, Gravel Packing Horizontal and Highly Deviated Openhole Completions Using a Single-Screen Prepacked Liner in Offshore California Fields, 1989, Society of Petroleum Engineers, pp. 165-178.
R. E. Cooper and J. C. Troncose, An Overview of Horizontal Well Completion Technology, 1988, Society of Petroleum Engineers, pp. 335-350.
R. E. Cooper, Coiled Tubing In Horizontal Wells, 1988, Society of Petroleum Engineers, pp. 323-334.
S. A. Andersen, S. A. Hansen and K. Fjeldgaard, Horizontal Drilling and Completion: Denmark, 1988, Society of Petroleum Engineers, pp. 155-165.
D. Kerr and K. Lesley, Mechanical Aspects of Medium Radius Well Design, 1988, Society of Petroleum Engineers, pp. 719-726.
J. E. Fontenot, Successful High Angle Completions, Cementing, and Drilling's Impact, 1988, Society of Petroleum Engineers, pp. 831-842.
J. Lessi and A. Spreux, Completion of Horizontal Drainholes, 1988, Society of Petroleum Engineers, pp. 209-218.
A. Spreux, A. Louis and M. Rocca, Logging Horizontal Wells-Field Practice for Various Techniques, 1987, Society of Petroleum Engineers, pp. 1-14.
J. B. Weirich, T. E. Zeleski Jr., and P. M. Mulcahy, Perforating the Horizontal Well: Designs and Techniques Prove Successful, 1987, Society of Petroleum Engineers, pp. 503-508.
R. H. Reiley, J. W. Black, T. O. Stagg, D. A. Walters and G. R. Atol, Cementing of Liners in Horizontal and High-Angle Wells at Prudhoe Bay, Alaska, 1987, Society of Petroleum Engineers, pp. 583-590.
M. B. Webster, G. E. Otott Jr. and D. L. Rice, Cementing High-Angle Wells Using Cement-Expanded Formation Packers And/Or Casing Rotation, 1987, SPE/IADC, pp. 745-754.
D. W. Sherrard, B. W. Brice and D. G. MacDonald, Application of Horizontal Wells at Prudhoe Bay, 1986, Society of Petroleum Engineers, pp. 1-16.
Andrew Gallup, B. L. Wilson and Robert Marshall, ESP's Placed in Horizontal Lateral Increase Production, Jun. 18, 1990, Oil & Gas Journal, pp. 58-60, 62 and 63.
Carl W. Stan, Alternative Electronic Logging Technique Locates Fractures in Austin Chaulk Horizontal Well, Nov. 6, 1989, Oil & Gas Journal, pp. 42-45.
D. D. Cramer, Guides Exist for Fracture Treatment in Horizontal Wells, Mar. 27, 1989, Oil & Gas Journal, pp. 41, 44, 46, 48 and 49.
Stephen A. Graham and Greg Nazzal, Second Lateral in Horizontal Well Solves Water Problem, Mar. 18, 1991, Oil & Gas Journal, pp. 111-114.
Richard S. Carden, Air Drilling Has Some Pluses for Horizontal Wells, Apr. 8, 1991, Oil & Gas Jouranl, pp. 76-78.
E. P. Deliac, J. P. Messines and B. A. Thierree, Mining Technique Finds Applications in Oil Exploration, May 6, 1991, Oil & Gas Journal, pp. 85-86, 88 and 90.
Siegfried K. Schueler, Horizontal Well Improves Recovery in Deep Sour Gas Field, Mar. 23, 1992, Oil & Gas Journal, pp. 93-94, 96 and 97.
Wade Dickinson, Eric Dickinson, Herman Dykstra and John M. Nees, Horizontal Radials Enhance Oil Production From A Thermal Project, May 4, 1992, Oil & Gas Journal, pp. 116, 118, 120, 122-124.
D. R. Schroeter and H. W. Chan, Successful Application of Drilling Technology Extends Directional Capability, Sep. 1989, SPE Drilling Engineer, pp. 230-236.
T. M. Gaynor, Downhole Control of Deviation with Steerable Straight-Hole Turbodrills, Mar. 1988, SPE Drilling Engineer, pp. 50-56.
W. Dickinson, R. R. Anderson and D. W. Dickinson, The Ultrashort-Radius Radial System, Sep. 1989, SPE Drilling Engineer, pp. 247-254.
M. A. Wilson and F. L. Sabins, A. Laboratory Investigation of Cementing Horizontal Wells, Sep. 1988, SPE Drilling Engineer, pp. 275, 278 aned 280.
H. J. Vrlellnk and A. M. Hippman, The Optimization of Slant-Well Drilling in the Lindbergh Field, Dec. 1989, SPE Drilling Engineer, pp. 307-314.
P. Hardman, Beckingham 36 Horizontal Well, Mar. 1989, SPE Drilling Engineer, pp. 17-23.
D. B. Chritain, Planning and Operational Requirements for a Shallow-Objective, High-Angle Well in the Gulf of Mexico, Sep. 1988, SPE Drilling Engineer, pp. 241-247.
J. P. Wilkinson, J. H. Smith, T. O. Stagg, and D. A. Walters, Horizontal Drilling Techniques at Prudhoe Bay, Alaska, 1980, Society of Petroleum Engineers, pp. 1-12.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and apparatus for locating and re-entering one or more ho does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and apparatus for locating and re-entering one or more ho, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for locating and re-entering one or more ho will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-791108

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.