Method and apparatus for delay analysis of energy transmitted th

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364506, 364553, 367102, G06F 1520, G01S 923

Patent

active

042790190

ABSTRACT:
A method and apparatus is disclosed for determining the manner by which an initial injection of wave energy is modified by a medium under test using a time delay spectrometer (TDS) and a fast Fourier transform (FFT). A switch allows either the time delay spectrum or an energy-time curve to be displayed. A differentiator at the input of the FFT corrects for inverse square loss of energy through the medium, i.e., compensates for spherical expansion of energy. Different arrangements of the TDS adapt the system to a medium having variable time delay, or adapt the system for measurement of harmonic distortion through the medium.

REFERENCES:
patent: 3135942 (1964-06-01), Tucker et al.
patent: 3466652 (1969-09-01), Heyser
patent: 3798590 (1974-03-01), Jacobson et al.
patent: 3906213 (1975-09-01), Meriaux et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and apparatus for delay analysis of energy transmitted th does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and apparatus for delay analysis of energy transmitted th, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for delay analysis of energy transmitted th will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2167938

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.