Wells – Processes – Parallel string or multiple completion well
Reexamination Certificate
2008-05-27
2008-05-27
Neuder, William (Department: 3672)
Wells
Processes
Parallel string or multiple completion well
C166S050000, C166S387000, C166S285000, C166S120000
Reexamination Certificate
active
11359059
ABSTRACT:
A hydraulically actuated anchor and a mechanically actuated packer are used in combination to secure a production tubing system in a lateral prior to injection of a cement to line the lateral borehole in which the production tubing is positioned. The packer is expanded to prevent fluid cement material from flowing past the packer into a junction area of the lateral with other laterals and aid the removal of superfluous cement material after hardening of the injected cement material around the production tubing system.
REFERENCES:
patent: 5526880 (1996-06-01), Jordan et al.
patent: 5845712 (1998-12-01), Griffith, Jr.
patent: 6241021 (2001-06-01), Bowling
patent: 6994165 (2006-02-01), Roane et al.
patent: 2006/0090906 (2006-05-01), Themig
patent: 2437678 (2004-02-01), None
Coy Nicole
Gunn & Lee PC
Lee Ted D.
Neuder William
Peak Completion Technologies, Inc.
LandOfFree
Method and apparatus for cementing production tubing in a... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and apparatus for cementing production tubing in a..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for cementing production tubing in a... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3922367