Mechanism for 3 rd generation partnership project multiple...

Multiplex communications – Communication over free space – Having a plurality of contiguous regions served by...

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C455S436000

Reexamination Certificate

active

08085731

ABSTRACT:
A system to promote connectivity for inter-radio access technology (RAT) handover from a first radio access network (RAN) to a second radio access network (RAN) is provided. The system comprises a component configured such that for each access point name (APN) in communication with the first radio access network (RAN), the maximum bit rate (MBR) for each active non-guaranteed bit rate (non-GBR) bearer in the second radio access network (RAN) is determined based on each respective access point name's (APN's) used aggregate maximum bit rate (AMBR) and the number of active non-guaranteed bit rate(s) (non-GBR) bearers for the respective access point name (APN).

REFERENCES:
patent: 2007/0019575 (2007-01-01), Shaheen
PCT International Preliminary Report on Patentability, PCT Application No. PCT/US2009/047824; Aug. 20, 2010; 12 pgs.
PCT International Search Report; PCT Application No. PCT/US2009/047824; Sep. 14, 2009; 4 pgs.
PCT Written Opinion of the International Searching Authority; PCT Application No. PCT/US2009/047824; Sep. 14, 2009; 6 pgs.
Research in Motion; Title: UE-AMBR Handling; 3GPP TG SA WG2 Meeting #68; TD S2-086831; Qingdao, China; Oct. 13-17, 2008; 8 pgs.
Research in Motion; Title: Two Type non-GBR AMBR & non GBR MBR QoS Mapping for I-RAT HO; 3GPP TSG-SA2 Meeting #66; 82-084867; Change Request; Montreal, Canada; Jun. 23-27, 2008; 3 pgs.
Ericsson, et al.; Title: AMBR per UE; 3GPP TSG SA WG2 Meeting #65; 52-04350; Change Request; Prague, Czech Republic; May 12-16, 2008; 19 pgs.
Samsung; Title: AMBR Modification Procedure; 3GPP TSG-SA WG2 Meeting #62; S2-080360; Change Request; Marina Del Rey, US; Jan. 14-18, 2008; 12 pgs.
3GPP TS 23.401v8.0.0; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) Enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Access; Release 8; Dec. 2007; 99 pgs. Part 1.
3GPP TS 23.401v8.0.0; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) Enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Access; Release 8; Dec. 2007; 68 pgs. Part 2.
3GPP TSG WG2 Meeting #64b; Solutions for AMBR per UE; Nokia Siemens Networks, Nokia; TD S2-083319; Munich, Germany; May 7-9, 2008; 2 pgs.
3GPP TSG SA WG2 Meeting #64; AMBR per UE; Ericsson, Alcatel-Lucent, AT&T, TeliaSonera; Change Request; S2-082943; Jeju Island, Korea; Apr. 7-11, 2008; 11 pgs.
3GPP TSG SA WG2 Meeting #64; AMBR per UE; Ericsson, Alcatel-Lucent, AT&T, TeliaSonera; Change Request; S2-083141; Jeju Island, Korea; Apr. 7-11, 2008; 11 pgs.
3GPP TSG SA WG2 Meeting #65; AMBR per UE: Ericsson, AT&T, Nokia, Nokia Siemens Networks, Nextwave, Alcatel-Lucent, Aualcomm; Change Request; S2-04350; Prague, Czech Republic; May 12-16, 2008; 19 pgs.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Mechanism for 3 rd generation partnership project multiple... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Mechanism for 3 rd generation partnership project multiple..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Mechanism for 3 rd generation partnership project multiple... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4296120

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.