Data processing: measuring – calibrating – or testing – Measurement system – Performance or efficiency evaluation
Reexamination Certificate
2006-07-14
2008-09-02
Lau, Tung S (Department: 2863)
Data processing: measuring, calibrating, or testing
Measurement system
Performance or efficiency evaluation
Reexamination Certificate
active
07421372
ABSTRACT:
A work scheduling method utilizes a Computerized Maintenance Management System (CMMS) which communicates with a work order database and a labor pool database, each having a plurality of entries therein. A resource leveling program accesses the entries in the databases and applies an order of fire to the entries to utilize available manpower in a manner which at least attempts to achieve plant success through the provision of at least a draft work schedule. After running the resource level program, the preferred embodiment allows user input to affect at least portions of the order of fire to allow modification and an ability to rerun the program.
REFERENCES:
patent: 2002/0174000 (2002-11-01), Katz et al.
patent: 2003/0171970 (2003-09-01), Kinsella
Brown Michael L.
Moss Robert D.
Reeve John
Lau Tung S
Miller & Martin PLLC
Stark Stephen J.
LandOfFree
Maintenance scheduling method does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Maintenance scheduling method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Maintenance scheduling method will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3990174