Loading arrangement for shuttle tankers

Ships – Mooring device

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C414S137700

Reexamination Certificate

active

06484658

ABSTRACT:

FIELD OF THE INVENTION
The invention is used on shuttle tankers, either on the bow or on the poop, for handling a mooring hawser and loading hose.
BACKGROUND ART
On traditional shuttle tankers the bow loading system is arranged so that the mooring winch is placed on the platform deck of the ship in its center line. A chain stopper and a fairlead are placed in front of the winch. The hose is pulled on board by means of a separate hose handling winch placed on the main deck in the center line of the ship. This solution requires the platform deck to have large dimensions due to the necessary structure underneath the mooring winch.
SUMMARY OF THE INVENTION
By modifying the mooring winch to include an extra drum for hose handling, the entire coupling procedure can be performed by one and the same winch. Through the use of guide pulleys the mooring winch can be placed on the main deck, an arrangement having several advantages. For instance, the size of the platform deck can be reduced, and the forces that occur can be absorbed in a simple manner due to the structure already present in the main deck.
This is obtained by extending a shaft out of the drive unit of the mooring winch and placing the hose handling drum thereon. Thus, the hose handling drum as well as the mooring drum are driven by the same drive unit, but may be operated independently of each other since it is possible to uncouple them from the drive unit. The combined winch is placed on the main deck with the hose handling drum in the center line of the ship. This means that the mooring drum will be located to the side of the center line of the ship. When pulling in of the mooring hawser, the hawser is guided through the fairlead and chain stopper. A horizontal guide pulley is placed behind the chain stopper in order to guide the hawser out from the center line of the ship. Next, the hawser is guided down to the mooring drum by means of a vertical guide pulley. After completion of the mooring operation, this part is uncoupled from the drive unit and the hose handling drum is connected in order to pull in the loading hose.


REFERENCES:
patent: 1940051 (1933-12-01), Heath
patent: 4867211 (1989-09-01), Dodge et al.
patent: 5064329 (1991-11-01), Brenna
patent: 1514713 (1978-06-01), None
patent: 2250253 (1992-06-01), None

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Loading arrangement for shuttle tankers does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Loading arrangement for shuttle tankers, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Loading arrangement for shuttle tankers will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2983132

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.