Active solid-state devices (e.g. – transistors – solid-state diode – Lead frame – With structure for mounting semiconductor chip to lead frame
Patent
1998-04-13
1999-11-02
Hardy, David B.
Active solid-state devices (e.g., transistors, solid-state diode
Lead frame
With structure for mounting semiconductor chip to lead frame
257666, H01L 23495
Patent
active
059776196
ABSTRACT:
Supporting leads extend from one side portion of a package to another side portion thereof and are arranged on both sides of an island such that both ends of the island are supported. An electrode for a fixing potential of a semiconductor chip is connected to these supporting leads by a bonding wire. One end of these supporting lead is located outside a column of an outer lead portion as the same structure as the outer lead portion. Thus, while a structure for commonly using each of the supporting leads as a lead for a fixing potential is adopted, a thermal distribution of the semiconductor chip can be uniformed and no island is inclined at a resin seal time.
REFERENCES:
patent: 5065224 (1991-11-01), Fraser et al.
patent: 5150194 (1992-09-01), Brooks et al.
patent: 5455200 (1995-10-01), Bigler et al.
patent: 5570046 (1996-10-01), Sharpe-Geisler
patent: 5592020 (1997-01-01), Nakao et al.
patent: 5907184 (1999-05-01), Corisis et al.
Hardy David B.
NEC Corporation
LandOfFree
Horizontal package having die supports leads formed along lead c does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Horizontal package having die supports leads formed along lead c, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Horizontal package having die supports leads formed along lead c will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2139180