High efficiency plant for making steel

Metal founding – Process – With measuring – testing – inspecting – or condition determination

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C164S428000, C164S480000, C164S420000, C164S418000

Reexamination Certificate

active

08042602

ABSTRACT:
A method of making steel comprising assembling a steelmaking furnace, a thin strip caster, and a mold caster, inputting to a computer data on demand and customer requirements for production output, raw materials, furnace availability and capacity, ladle treatment for casting, sequence schedules and through-put, capacities and variability, forecasting by processing by computer from the inputted data a production schedule for the steelmaking furnace and ladle treatment, and sequence schedules for the thin strip and the mold casters as a function of molten metal availability, the thin strip and mold caster sequence schedules and through-put, and demand for production output, directing production of molten metal alternatively to the delivery systems of the thin strip caster and mold caster responsive to said forecasting, and varying during casting the rate of metal delivery through the delivery system of the thin strip caster responsive to molten metal availability and the mold caster through-put.

REFERENCES:
patent: 5212791 (1993-05-01), Damian et al.
patent: 5267604 (1993-12-01), Kuttner et al.
patent: 5518064 (1996-05-01), Romanowski et al.
patent: 5727127 (1998-03-01), Schulze et al.
patent: 5802097 (1998-09-01), Gensini et al.
patent: 5902371 (1999-05-01), Frank
patent: 5924184 (1999-07-01), Donini et al.
patent: 6332522 (2001-12-01), Morse et al.
patent: 6606527 (2003-08-01), de Andrade, Jr. et al.
patent: 6684117 (2004-01-01), Bacin et al.
patent: 2002/0062942 (2002-05-01), Strezov et al.
patent: 2003/0196776 (2003-10-01), Strezov et al.
patent: 2006/0272447 (2006-12-01), Peaslee et al.
patent: 60-238002 (1985-11-01), None
patent: 0226423 (2002-04-01), None
“Accurate, Stable Measurements of Continuous Casters and Billet Casters”, BETA LaserMike, www.betalasermike.com, Copyright 2008 Beta LaserMike.
“Billet casting solutions”, Siemens VAI, www.siemens-vai.com, Copyright 2009 Siemens AG.
“Continuous Casting of Steel: Basic Principles”, http://www.energymanagertraining.com/iron—steel/cont—cast—steel.htm, Printed Feb. 25, 2009.
Fuchshuber et al., “Modern billet casting technology”, Millennium Steel International, 2004, pp. 162-167.
Inazaki et al., “Computer Control System for CC-DR Process”, Presented to the 104th ISIN Meeting, Sep. 1982, S1074, at Hokkaido University in Sapporo, Copyright 1984 ISIJ.
Nozaki et al., “Horizontal Continuous Casting Processes—The State of the Art and Future Trends—”, Transactions ISIJ, vol. 27, 1987, pp. 321-322.
“Simetal CIS Heat Pacer, Hot metal and steel production at a glance—For maximized throughput of your plant”, Siemens VAI, www.siemens-vai.com, Copyright 2008 Siemens AG.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

High efficiency plant for making steel does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with High efficiency plant for making steel, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and High efficiency plant for making steel will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4267514

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.