ABSTRACT:
Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data (11) corresponding to schedules of the tasks that individual ones of the resources are to carry out, from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period. Not all the tasks are scheduled, resulting in unscheduled task data (11a). The schedule data (11) is downloaded to a workstation (7) together with the unscheduled task data. The downloaded data is analysed at the workstation to determine a candidate resource (E) to perform the task (T) corresponding to the unscheduled task data.
REFERENCES:
patent: 4852001 (1989-07-01), Tsushima et al.
patent: 5408663 (1995-04-01), Miller
patent: 5615121 (1997-03-01), Babayev et al.
patent: 5826236 (1998-10-01), Narimatsu et al.
patent: 5890134 (1999-03-01), Fox
patent: 6578005 (2003-06-01), Lesaint et al.
patent: 2003/0229529 (2003-12-01), Mui et al.
patent: WO 98/22897 (1998-05-01), None
Parrott et al., “Comparing the WMS real time algorithm with AIP predictive schedulers”, BT Technology Journal, vol. 13, No. 1, Jan. 1995, pp. 110-120.
Alletson Ian S
Laithwaite Robert N W
Pothos Dionisios
@Road, Ltd.
Chow Chih-Ching
Nixon & Vanderhye PC
Vo Ted T.
LandOfFree
Handling unscheduled tasks in a scheduling process does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Handling unscheduled tasks in a scheduling process, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Handling unscheduled tasks in a scheduling process will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3735372