Generation of engineering change order (ECO) constraints for...

Computer-aided design and analysis of circuits and semiconductor – Integrated circuit design processing – Physical design processing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C716S115000

Reexamination Certificate

active

07962876

ABSTRACT:
Static timing and/or noise analysis are performed on a netlist of an integrated circuit, to estimate behavior of the netlist and to identify at least one violation by said behavior of a corresponding requirement thereon, such as setup time, hold time or bump height in a quiescent net. Thereafter, effect of engineering change order (ECO) to correct the violation are automatically analyzed, based on the layout, the parasitics, the timing and/or noise behavior, and the violation, followed by generation of a constraint on the behavior (called “ECO” constraint), such as a timing constraint and/or a noise constraint. Next, the ECO constraint is automatically used, e.g. in a place and route tool, to select an ECO repair technique, from several ECO repair techniques that can overcome the violation. The selected ECO repair technique is automatically applied to the layout, to generate a modified layout which does not have the violation.

REFERENCES:
patent: 7069528 (2006-06-01), Kovacs et al.
patent: 7363605 (2008-04-01), Kondratyev et al.
patent: 7363607 (2008-04-01), Birch et al.
patent: 7383522 (2008-06-01), Murgai et al.
patent: 7454731 (2008-11-01), Oh et al.
Entire Prosecution History of U.S. Appl. 11/525,578, filed Sep. 22, 2006 by Nahmsuk Oh et al. issued as US Patent 7,454,731.
Hanchate, N. et al., “A Linear Time Algorithm for Wire Sizing with Simultaneous Optimization of Interconnect Delay and Crosstalk Noise”, Proceedings of the 19th International Conference on VLSI Design, (VLSID'06), 2006, 283-290.
Alpert, C. J. et al., “Buffer Insertion for Noise and Delay Optimization”, IEEE Transactions on computer-aided design of integrated circuits and systems, Nov. 1999, vol. 18, No. 11, pp. 1633-1645.
Jiang, Iris Hui-Ru et al., “Crosstalk-Driven Interconnect Optimization by Simultaneous Gate and Wire Sizing”, IEEE Transactions on computer-aided design of integrated circuits and systems, Sep. 2000, vol. 19, No. 9, pp. 999-1010.
Vittal, A. et al., “Crosstalk Reduction for VLSI”, IEEE Transactions on computer-aided design of integrated circuits and systems, Mar. 1997, vol. 16, No. 3, pp. 290-298.
Saxena, P. et al., “A Postprocessing Algorithm for Crosstalk-Driven Wire Perturbation”, IEEE Transactions on computer-aided design of integrated circuits and systems, Jun. 2000, vol. 19, No. 6, pp. 691-702.
Becer, M. R. et al., “Postroute Gate Sizing for Crosstalk Noise Reduction”, IEEE Transactions on computer-aided design of integrated circuits and systems, Dec. 2004, vol. 23, No. 12, pp. 1670-1677.
Odabasioglu, A. et al., “PRIMA: Passive Reduced-Order Interconnect Macromodeling Algorithm”, IEEE Transactions on computer-aided design of integrated circuits and systems, Aug. 1998, vol. 17, No. 8, pp. 645-654.
Zhou, H. et al., “Global Routing with Crosstalk Constrains”, IEEE Transactions on computer-aided design of integrated circuits and systems, Nov. 1999, vol. 18, No. 11, pp. 1683-1688.
Xiao, T. et al., “Gate Sizing to Eliminate Crosstalk Induced Timing Violation”, Proceedings of the International Conference on Computer Design: VLSI in Computers and Processors (ICCD'01), 2001, pp. 186-191.
Chen, Chung-Ping et al., “Noise-aware Repeater Insertion and Wire Sizing for On-chip Interconnect Using Hierarchical Moment-Matching”, 36thAnnual Conference on Design Automation (DAC'99), 1999, pp. 502-506.
Bai, X. et al., “Noise-Aware Driver Modeling for Nanometer Technology”, Fourth International Symposium on Quality Electronic Design, 2003, 6 pgs.
Shepard, K. L., “Design Methodologies for Noise in Digital Integrated Circuits”, 35thDesign Automation Conference, 1998, 6 pgs.
Shepard, K. L. et al., “Harmony: Static Noise Analysis of Deep Submicron Digital Integrated Circuits”, IEEE Transactions on computer-aided design of integrated circuits and systems, Aug. 1999, vol. 18, No. 8, pp. 1132-1150.
Guardiani, C. et al., “Modeling the Effect of Wire Resistance in Deep Submicron Coupled Interconnects for Accurate Crosstalk Based Net Sorting”, Proc. of PATMOS, Oct. 1998, (Advanced Research, Central R&D, DAIS, STMicroelectronics, via C. Olivetti, 2, I-20041 Agrate B., (MI), Italy), pp. 287-296.
Pandini, D. et al., “Network Reduction for Crosstalk Analysis in Deep Submicron Technologies”, International Workshop on Timing Issues, 1997, (Advanced Research, SGS-Thomson Microelectronics, via C. Olivetti 2, 20041 Agrate Brianza, Italy), 10 pgs.
Elmore, W.C. “The Transient Response of Damped Linear Networks with Particular Regard to Wideband Amplifiers”, Journal of Applied Physics, vol. 19, Jan. 1948, pp. 55-63.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Generation of engineering change order (ECO) constraints for... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Generation of engineering change order (ECO) constraints for..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Generation of engineering change order (ECO) constraints for... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2745249

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.