ABSTRACT:
Methods, computer program products and systems are disclosed for generating a planned time duration for a manufacturing process operation defined for planning purposes that includes an aggregation of multiple defined execution operations. Electronic information is received that specifies a production demand that requires use of the manufacturing process for fulfillment. A linear approximation is electronically generated of an overall time duration measure for the defined manufacturing process planning operation. The overall time duration measure is a sum of time components comprising at least a calculated measure for a variable time component for the longest of the multiple execution operations for the received production demand, and a fixed time duration measure for one send-ahead quantity for each of the multiple execution operations that is not the longest. The generated overall time duration measure is then returned.

REFERENCES:
patent: 5231567 (1993-07-01), Matoba et al.
patent: 5303144 (1994-04-01), Kawashima et al.
patent: 5369570 (1994-11-01), Parad
patent: 5442561 (1995-08-01), Yoshizawa et al.
patent: 5442730 (1995-08-01), Bigus
patent: 5764543 (1998-06-01), Kennedy
patent: 5787000 (1998-07-01), Lilly et al.
patent: 5870696 (1999-02-01), Randolph
patent: 5966694 (1999-10-01), Rothschild et al.
patent: 5980086 (1999-11-01), Kanematsu et al.
patent: 6233538 (2001-05-01), Gupta et al.
patent: 6249715 (2001-06-01), Yuri et al.
patent: 6259959 (2001-07-01), Martin
patent: 6345256 (2002-02-01), Milsted et al.
patent: 6345259 (2002-02-01), Sandoval
patent: 6360188 (2002-03-01), Freidman et al.
patent: 6434440 (2002-08-01), Teranishi et al.
patent: 6496747 (2002-12-01), Suzuki
patent: 6546300 (2003-04-01), Fukuda et al.
patent: 6606527 (2003-08-01), de Andrade et al.
patent: 6662066 (2003-12-01), Yu et al.
patent: 6668208 (2003-12-01), Baumbusch et al.
patent: 6738686 (2004-05-01), Caretta et al.
patent: 6839601 (2005-01-01), Yazback et al.
patent: 6873878 (2005-03-01), Liu et al.
patent: 6898472 (2005-05-01), Crampton et al.
patent: 7031893 (2006-04-01), Gupta et al.
patent: 7054703 (2006-05-01), Wu et al.
patent: 7058587 (2006-06-01), Horne
patent: 7139719 (2006-11-01), Cherneff et al.
patent: 7162318 (2007-01-01), Brearley et al.
patent: 7328078 (2008-02-01), Sanford et al.
patent: 7363324 (2008-04-01), Aboulnaga et al.
patent: 7376548 (2008-05-01), Sinclair
patent: 7412295 (2008-08-01), Rothenburg
patent: 7489982 (2009-02-01), Liu et al.
patent: 7496860 (2009-02-01), Saxena et al.
patent: 2003/0014314 (2003-01-01), Griep et al.
patent: 2003/0050817 (2003-03-01), Cargille et al.
patent: 2004/0193502 (2004-09-01), Heitner et al.
patent: 2006/0106473 (2006-05-01), Enright et al.
patent: 2006/0155412 (2006-07-01), Ikeda
patent: 2007/0162491 (2007-07-01), Schmitz et al.
patent: 2008/0103715 (2008-05-01), Tsuda et al.
patent: 2008/0140356 (2008-06-01), Sanford et al.
patent: 2009/0039024 (2009-02-01), Jenkins et al.
Materials printed from www.wassermann.de website regarding Wassermann Supply Chain Software (5 pages), printed Mar. 10, 2006.
Shaw C. Feng, Manufactring Planning and Execution Software Interfaces, 2000, Journal of Manufacturing System, vol. 19/No. 1, p. 1-17.
Almeida et al. “A Workload Data Aggregation Process for Flexible Manufacturing System Modeling using Queueing Network Models” 2001 International Journal of Flexible Manufacturing Systems, pp. 309-350.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Generating planning-level time and capacity requirement... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Generating planning-level time and capacity requirement..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Generating planning-level time and capacity requirement... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4054437

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.