Fluid handling – Plural tanks or compartments with parallel flow – Sequentially filled and emptied
Reexamination Certificate
2007-12-25
2007-12-25
Huson, Gregory (Department: 3753)
Fluid handling
Plural tanks or compartments with parallel flow
Sequentially filled and emptied
C137S266000
Reexamination Certificate
active
10707390
ABSTRACT:
A gas regulation system includes a manifold, a plurality of control modules in fluid communication with the manifold, and a power source. Each control module includes an actuatable valve that is in fluid communication with an associated gas storage device and in electrical communication with the power source. The power source is adapted to prevent more than one of the actuatable valves from simultaneously having an actuated state.
REFERENCES:
patent: 2793813 (1957-05-01), Belcher, Jr.
patent: 3322135 (1967-05-01), Watson
patent: 3719196 (1973-03-01), McJones
patent: 4645908 (1987-02-01), Jones
patent: 4958659 (1990-09-01), Dowdall
patent: 5323752 (1994-06-01), von Herrmann et al.
patent: 6651701 (2003-11-01), Kuriiwa et al.
patent: 2002/0092575 (2002-07-01), Takeda et al.
patent: 2002/0094469 (2002-07-01), Yoshizumi et al.
patent: 2002/0125998 (2002-09-01), Petite et al.
patent: 2002/0134342 (2002-09-01), Agricola et al.
patent: 2002/0148502 (2002-10-01), Fujita
Cantor & Colburn LLP
Huson Gregory
Proton Energy Systems, Inc.
Schneider Craig
LandOfFree
Gas regulation system and process for operating the gas... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Gas regulation system and process for operating the gas..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Gas regulation system and process for operating the gas... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3851040