Formation of in situ oil shale retort with void at the top

Mining or in situ disintegration of hard material – Tunnel recovery of fluid material

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

299 13, 166259, E21C 4110

Patent

active

042381363

ABSTRACT:
A method of forming an in situ oil shale retort with an open space or inlet plenum void between the top boundary of the fragmented permeable mass of oil shale particles and the unfragmented formation above the retort. The method comprises excavating at least one horizontal void in the formation, placing explosive into the unfragmented formation above and below the void, and then explosively expanding formation above the void prior to explosively expanding formation below the void. The additional time for expansion of formation above the void, as compared with that below the void, permits non-uniform expansion and leaves an open space over the top of the fragmented mass.

REFERENCES:
patent: 2481051 (1949-09-01), Uren
patent: 4153300 (1979-05-01), Kvapil et al.
patent: 4162808 (1979-07-01), Kvapil et al.
patent: 4167213 (1979-09-01), Stoltz et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Formation of in situ oil shale retort with void at the top does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Formation of in situ oil shale retort with void at the top, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Formation of in situ oil shale retort with void at the top will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2277576

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.