Forecasting tool for predicting future demand for parts /...

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Discount or incentive

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Reexamination Certificate

active

07552065

ABSTRACT:
A forecasting tool predicts future demand for quantifiable items in connection with a plurality of projects. The tool has multiple tables, where each table has information therein. In particular, a project table has project information for each project, where the project information includes a reference to items (materials) to be employed in connection with the project. An item table has item information for each item referenced by the project table, where the item information includes a reference to an algorithm to be employed to determine a quantity of the item for a particular project. An algorithm table has algorithm information for each algorithm referenced by the item table. Thus, the quantity of a needed item for a particular project may be determined by determining the specifics of the necessary algorithm, obtaining any inputs necessary for the algorithm from the tables, and applying the inputs to the algorithm.

REFERENCES:
patent: 5189606 (1993-02-01), Burns et al.
patent: 5287267 (1994-02-01), Jayaraman et al.
patent: 5311438 (1994-05-01), Sellers et al.
patent: 5408663 (1995-04-01), Miller
patent: 5450317 (1995-09-01), Lu et al.
patent: 5548518 (1996-08-01), Dietrich et al.
patent: 5655118 (1997-08-01), Heindel et al.
patent: 5761674 (1998-06-01), Ito
patent: 5797129 (1998-08-01), Rohan
patent: 5826252 (1998-10-01), Wolters et al.
patent: 5870743 (1999-02-01), Cohen et al.
patent: 5878262 (1999-03-01), Shoumura et al.
patent: 5893074 (1999-04-01), Hughes et al.
patent: 5918219 (1999-06-01), Isherwood
patent: 5924094 (1999-07-01), Sutter
patent: 5950206 (1999-09-01), Krause
patent: 6216109 (2001-04-01), Zweben et al.
patent: 6351734 (2002-02-01), Lautzenheiser et al.
patent: 6415195 (2002-07-01), Gleditsch et al.
patent: 6415196 (2002-07-01), Crampton et al.
patent: 6415260 (2002-07-01), Yang et al.
patent: 6480836 (2002-11-01), Colby et al.
patent: 6571215 (2003-05-01), Mahapatro
patent: 6678671 (2004-01-01), Petrovic et al.
patent: 6711550 (2004-03-01), Lewis et al.
patent: 7117162 (2006-10-01), Seal et al.
patent: 7174339 (2007-02-01), Wucherer et al.
Project Materials Management Primer The Construction Industry Institute Materials Management Task Force, Publication 702, Nov. 1988.
Ronen, Boaz et al., A Decision Support System for Purchasing Management of Large Projects Operations Research, vol. 36, No. 6, Nov./Dec. 1988, pp. 882-890.
Passanisi, Peter et al., Materials Procurement Association of Cost Engineers, 1983, Abstract.
Lansford, Bell C. et al., Materials Management in Industrial Construction Association of Cost Engineers, 1985, Abstract.
Silver, Edward A., Materials Management in Large-Scale Construction Projects: Some Concerns and Research Issues Engineering Costs and Production Economics, vol. 15, May 1989, Abstract.
Tavakoli, Amir et al., MMS: A materials management system Construction Management and Economics, vol. 11, 1994, pp. 143-149.
Marquardt, Thomas R., Total cost of ownership via effective materials management Transactions of AACE International, 1994.
SP4-Project Materials Management Handbook Construction Institue, Retrieved from Construction-institute.org on Apr. 23, 2007.
IR7-3—Procurement and Materials Management: A Guide to Effective Project Execution Construction Institute, Retrieved from construction-institute.org.
Elmasri, Ramez et al., Fundamentals of Database Systems—Third Edition Addison-Welsey, 2000, ISBN: 0-8053-1775-4.
Hendrickson, Chris, Project Management for Construction Prentice Hall, 1998, ISBN 0-13-731266-0.
Opfer, Neil D., Just-In-Time Construction Materials Management AACE Internation Transactions, 1998.
Aquilano, Nicholas J. et al., A format set of algorithms for project scheduling with critical path scheduling/material requirements planning, Journal of Operations Management, vol. 1, No. 2, Nov. 1980, Abstract.
Smith, Dwight Edward, A Combined Critical Path Method—Material Requirements Planning Model For Project Scheduling Subject to Resource Constraints, The University of Arizona, 1980, AAT 8027741, Abstract.
Smith, Dwight E. et al., Contrained resource project scheduling subject to material constraints Journal of Operations Management, vol. 4, No. 3, Aug. 1984, Abstract.
Cook, Robert R., Computerized Materials Management for Engineering/Construction Projects American Association of Cost Engineers, 1984, Abstract.
Marsh, Jon W., Materials Management: Practical Application in the Construction Industry Cost Engineering: vol. 27, No. 8, Aug. 1985, Abstract.
Smith-Daniels, Dwith E. et al., Optimal Project Scheduling with Materials Ordering IIE Transactions, vol. 19, No. 2, Jun. 1987, Abstract.
Shtub, Avraham, The Integration of CPM and material management in project management Construction Management and Economics, vol. 6, 1988, pp. 261-272.
Bragg, Daniel J. et al., Material requirements planning and purchasing Journal of Purchaing and Materials Management, vol. 25, No. 1, Spring 1989.
Imam, Muhammad H., Project Management in Telecommunications American Association of Cost Engineers, 1990.
Puckett, James C. et al., Cradle-to-Grave Material Management Association of Cost Engineers, 1991.
Berka, John H. et al., Materials management: a comprehensive system Transactions of AACE International, 1994.
Akintoye, Akintola, Just-in-Time application and implementation for building material management Construction Management and Economics, Oct. 1995, vol. 13, pp. 105-113.
Graham, Kenneth A., CostTrack Cost Engineering, vol. 42, No. 9, Sep. 2000, pp. 23, 25.
Clough, Richard H. et al., Construction Project Management John Wiley & Sons, 2000, ISBN: 0-471-32438-8.
Krajewski, Lee J. et al., Operations Management Addison-Wesley, 1996, ISBN: 0-201-82293-8.
Marsh, Jon, Materials Management: Practical Application in the Construction Industry Cost Engineering, vol. 27, No. 8, Aug. 1985.
Smith-Daniels, Dwight, E. et al., Optimal Project Scheduling with Materials Ordering IIE Transactions, vol. 19, No. 2, Jun. 1987.
Smith-Daniels, Dwight E. et al., Constrained Resource Project Scheduling Subject to Material Constraints Journal of Operations Management, vol. 4, No. 4, Aug. 1984.
Aquilano, Nicholas, J., A Formal Set of Algorithms For Project Scheduling With Critical Path Scheduling/Material Requirements Planning, Journal of Operationsl Management, vol. 1, No. 2, Nov. 1980.
Cook, Robert R., Computerized Materials Management for Engineering/Construction Projects AACE Transactions, 1984.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Forecasting tool for predicting future demand for parts /... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Forecasting tool for predicting future demand for parts /..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Forecasting tool for predicting future demand for parts /... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4125683

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.