Static structures (e.g. – buildings) – Processes – Filling preformed cavity
Patent
1992-12-07
1994-11-01
Cuomo, Peter M.
Static structures (e.g., buildings)
Processes
Filling preformed cavity
526494, 405239, E04B 118
Patent
active
053598296
ABSTRACT:
A method and apparatus for fabricating a drilled, concrete pier in the earth at a construction site is disclosed. The method comprises the steps of providing a template from which vertical reinforcement bars may be suspended and disposed in spatial alignment generally defining the periphery of the reinforcement cage. All the vertical reinforcement bars of the reinforcement cage are suspended in vertical disposition from the template. Horizontal ties are positioned at selected sides along the length of the reinforcement bars, and are fastened to the vertical reinforcement bars at said sites. In this way, fabrication of the reinforcement cage is completed while the cage is vertically suspended from the template. The reinforcement cage can be fabricated and suspended directly above, and later lowered into, a hole drilled in the earth for a drilled pier foundation.
REFERENCES:
patent: 517808 (1894-04-01), Ransome
patent: 1008209 (1911-11-01), Skinner
patent: 1708277 (1929-04-01), Martin
patent: 3110982 (1963-11-01), Besinger
patent: 4269544 (1981-05-01), Rusche
patent: 4377928 (1983-03-01), Hasak
patent: 4467583 (1984-08-01), Hasak
patent: 4627211 (1986-12-01), Foster, Jr.
Boucher Darnell
Cuomo Peter M.
Duffy James
Klein Christopher A.
LandOfFree
Fabrication and installation of steel reinforcement cages for pi does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Fabrication and installation of steel reinforcement cages for pi, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Fabrication and installation of steel reinforcement cages for pi will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-1794967