Exception handling in manufacturing systems combining...

Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S110000

Reexamination Certificate

active

07043321

ABSTRACT:
A method for performing exception handling operates within a computer controlled multi-step production system for producing objects. The system includes a system controller, within which reside a planner/scheduler and module controller(s). The system controller receives a stream of object specifications for objects to be produced including the jobs to which they belong. The planner/scheduler plans and schedules the jobs incrementally, and the system controller sends commands to the module controller(s) directing production of the planned and scheduled objects by production system modules. The method includes receiving notice in the system controller of a problem situation present within the multi-step production system and halting planning for the production of subsequent objects. Plans are canceled plans for all objects that have not begun production, and all objects affected by the problem situation are marked as bad objects. The system controller planned exception handling/recovery or module controller directed exception handling/recovery is applied and normal operation is resumed.

REFERENCES:
patent: 5093794 (1992-03-01), Howie et al.
patent: 5696893 (1997-12-01), Fromherz et al.
patent: 6216109 (2001-04-01), Zweben et al.
patent: 6400999 (2002-06-01), Kashiyama et al.
patent: 6604017 (2003-08-01), Richardson et al.
patent: 6684121 (2004-01-01), Lu et al.
patent: 6947803 (2005-09-01), Bode et al.
U.S. Appl. No. 10/424,322 entitled “Monitoring and Reporting Incremental Job Status System and Method”, Fromherz et al., filed Apr. 28, 2003.
U.S. Appl. No. 10/424,661 entitled “Predictive and Preemptive Planning and Scheduling for Different Job Priorities System and Method” Fromherz et al., filed Apr. 28, 2003.
U.S. Appl. No. 10/424,620 entitled “Planning and Scheduling for Failure Recovery System and Method” Fromherz et al., filed Apr. 28, 2003.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Exception handling in manufacturing systems combining... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Exception handling in manufacturing systems combining..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Exception handling in manufacturing systems combining... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3535628

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.