Evaluation value computing system in production line simulator

Data processing: structural design – modeling – simulation – and em – Modeling by mathematical expression

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C703S006000, C700S100000, C700S103000

Reexamination Certificate

active

06405157

ABSTRACT:

BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates generally to an evaluation value computing system in a production line simulator. More particularly, the invention relates to a method for determining a parameter to be set in a simulator in a production line simulation.
2. Description of the Related Art
Conventionally, when a simulation of a production line is used, modeling of a current line is performed. In modeling of the production line, parameters to be set in a model are determined on the basis of experience and/or prediction of an operator responsible for setting the parameters. In the alternative, a method to determine the parameters on the basis of collected performance data has also been known.
Here, as parameters to be set in the simulator, a time required in process in each production step of the production line, a time requiring for preparation for the process, a time for constraining a production facility, tool, and worker, a time required for transporting a product to a next process step after completion of operation in each production step, a time required for moving the tool and/worker and so forth are known as important parameters. These times are generally referred to as “standard time”.
Upon implementation of the production line simulation, a value representative of how long a product in question constrains a production facility in question when the product is processed in the production facility, namely the “standard time” is important factor determining reliability of a result of simulation. Since the “standard time” significantly influences for the result of simulation, the “standard time ” may also be referred to as “evaluation value”.
The “standard time” as the evaluation value fluctuates significantly depending upon process condition, amount of products and so forth. Therefore, it is determined or derived by the method set forth above on the basis of time-series information of past events occurred in the factory and set as one of parameter in the production line simulation. Such determination or derivation method utilizes one of or combination of an average value, a maximum value, a minimum value, a center value, a most frequent value and dispersion, or a value derived by the foregoing method and fluctuation assuming normal distribution.
In Japanese Unexamined Patent Publication No. Heisei 7-129677, a method of deriving the evaluation value from a production performance data by means a reference data generating means is employed. On the other hand, in Japanese Unexamined Patent Publication No. Heisei 7-45490, when a difference between the simulation result and performance is large, for a parameter having large dispersed value, a method of automatically re-deriving a value is employed. Furthermore, while not employed in the simulation, as a method of deriving the evaluation value reflecting a distribution, there is a derivation method employing histogram.
A first problem is that when. the evaluation value derived by the conventional method is set, difficulty is caused in matching the simulation result and the performance. The reason is that the evaluation value derived by the conventional method is not appropriate for representing its parameter, in practice. Namely, the reason is that the conventional method is established under a premise that the distribution of the performance data is symmetric or normally distributed. In practice, distribution of the data is irregular shape and contains large number of abnormal value. As a result, in order to obtain simulation result adapted to performance, adjustment of parameter with huge amount of process steps with human judgment is required.
Even in the method disclosed in Japanese Unexamined Patent Publication No. Heisei 7-45490, it cannot be adapted to the case where a plurality of evaluation values are not certain. Furthermore, in order to determine one evaluation value, simulation has to be performed for many times. In simulation of the production line, it has been know that the final simulation result should fluctuate significantly if the evaluation value of the primary one of production facility is not certain. This appears more significantly in a semiconductor fabrication line.
A second problem is that when an abnormal value is contained in the data as objective for analysis in the conventional method, the evaluation value should be affected significantly by the abnormal value unless the abnormal value is removed preliminarily. Therefore, a logic for eliminating the abnormal value has to be preliminarily prepared. On the other hand, there is no means for definitely determining a range of the abnormal value other than that setting by human experience.
A third problem is to take a long period until execution of reliable simulation utilizing a method reflecting the conventional distribution in order to derive the evaluation value. The reason is that, in the method of the conventional histogram reflecting distribution, there is no simple means for determining a unit width of the histogram and where to start the initial value, and it takes a long period for computing process to require huge amount of time for obtaining a final evaluation value.
A fourth problem is that, particularly in the semiconductor fabrication, it becomes necessary to review once derived evaluation value for frequent occurrence of fluctuation of mixing of product class, addition of new production facility, expansion or modification of condition. Then, set parameter has to be adjusted with huge amount of process step at every occasion of reviewing.
SUMMARY OF THE INVENTION
It is therefore an objection of the present invention to provide a simulation model by deriving an evaluation value of parameter adapted to a real data, an evaluation value computing system on a line simulator of a production line, which can obtain realistic simulation result, and an evaluation value computing method.
According to the first aspect of the present invention, an evaluation value computing system in a production line simulator for computing a standard time of a product processing period as an evaluation value, which is set in a production facility model to be used in the production line simulation and represents a period for constraining state of the production facility for production process or preparatory work for production process, comprises:
event reporting means for reporting event occurring in the production facility;
required time deriving and determining means for deriving and determining a required time required for production process in the production facility on the basis of a reported event, and accumulating the required time as data; and
evaluation value computing means for deriving the standard time on the basis of the accumulated data, the evaluation value computing means including:
sorting means for sorting the accumulated data in a sequential order of values,
center value means for deriving a first center value on the basis of result of sorting;
zone setting means for detecting data on which an absolute value of a difference with the first center value becomes smaller and setting a zone where number of the data to be detected exceeds half of all data number, and
evaluating means for deriving a new second center value of data within the set zone, comparing a difference between the second center value and the first center value with a convergence judgment reference value preliminarily set close to zero and determining whether the second center value can be regarded as the evaluation value on the basis of result of comparison.
In the preferred construction, the evaluation value computing means may repeatedly operate the zone setting means and the evaluation means until the difference becomes smaller than the convergence judgement reference value when the difference between the second center value and the first center value is greater than the convergence judgement reference value.
The evaluation value computing system may further comprise data classifying means for classifying data determined by the required

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Evaluation value computing system in production line simulator does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Evaluation value computing system in production line simulator, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Evaluation value computing system in production line simulator will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2917311

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.